Laserfiche WebLink
y <br /> ed In layers no more than two feet thick.-- The refuse shall. <br /> e compacted by a minimum of four passes with a bulldozer. <br /> The refuse shall be spread by pushing the refuse uphill at a <br /> slope between : I and 2:1 . The working face shall be as nar- <br /> rowpractical . Where possible, the working face should be <br /> no wider than thirty feet. . <br /> Before the end of every day that the facility is open, the Con- <br /> tractor shall spread and compact a daily cover over the com- <br /> pacted acted and spread refuse. The daily cover will be a, minimum <br /> and be the naturally occurring .sand at the site. No refuse <br /> _ w <br /> shall be visible through this daily cover; The daily cover <br /> shall 'be a minimum thickness of six inches. <br /> The first week of every month the + Contracor shall place over { <br /> the top and sides of the fill a six- inch minimum -thickness of <br /> the clayey suboil. This intermediate layer shall be contin- <br /> uous and impermeable. ' <br /> When the final fill is placed in a particular section, the Conow <br />' tractor shah. lace final cover with a minimum one foot <br /> - p <br /> thick 1Y.er of clayey subsoil and a minimum tap layer Of four <br /> inches of loam. These materials .shall have been previously <br /> stripped and stockpiled at the - s-ite. <br /> This final cover shall be graded. The Contractor shall ,l+ime <br /> the final cover at. application gate of 1000 pounds per acre <br /> applied uniformly. The Contractor wi1.1 thea apply uniformly <br /> 10-6-4 analysis fertilizer at a rate 'f 600 pounds per acre.. <br /> The Contractor shall word the lime' and the fertilizer into the <br /> full depth of the loam. The Contractor' shall uniformly apply <br /> } at a rate of 50 pounds per acre. a ass seed mixture of 0 <br /> Creeping Red Fescue, . . Kentucky Blue Grass , 40% Kentucky <br /> Tall Fescue and 30 a'nnu I Rye Grass . The Contractor will <br /> then rake., roll and water the seeded grass in a workmanlike <br /> manner. The newly seeded grass should be watered every day for <br /> IP . fourteen 14 days . <br /> The Contractor shall furnish and install temporary fences for' <br /> the control of litter. The Contractor shall daily pick up Any <br />