Laserfiche WebLink
5 , <br /> ■ <br /> -4- <br /> litter <br /> -litter in the. land fill site, <br /> The Contractor shall weekly inspect the final and intermediate <br /> cover and repair and re-see-d any cracks or erosion, <br /> The Contractor Shall set as-ide areas for the salvage of metal <br /> which will become the property of the Contractor. The Contrac_. <br /> for shall set aside areas for any other salvage as directed by <br /> the goard of Health which salvage shall be the+ poperty of the <br /> Town. <br /> The Contractor shall furniish and maintain a .Johnson and John- , <br /> son Emergency First Aid Kit in a steel case or equal in the <br /> buildings. The Contr.actorshall furnish and maintain - a John <br /> son <br /> J hnson and .Johnson Family First Aid Kit or equal in the dump truck, <br /> the bulldozer and the front end loader., The Contractor shall <br /> furnish and maintain a '2 1/2 pound multi-pu' rpose fire extinguish- <br /> er with a UL listing. of l -l o B;.0 with the dump truck, the bull- <br /> dozer and the front end loader. The Contractor shall furnish <br /> F and maintain a ten pound fire extinguisher with a UL rating of <br /> i - :'C in thebuildings.' <br /> ildin The Contractor shall furnish and <br /> '_' ,_ <br /> maintain sixty linear feet of garden hose in the buildings t <br /> use on hot - loads. <br /> dAllr <br /> The i l .area will he opened + _' s a' week: Sunday,. <br /> Monday, Wre, nesday Friday and Saturday, Closed on Tuesday aftd:. <br /> .and-the following holidays :. New Years , Fourth of <br /> .July, Thanksgiving and Christmas,. . <br /> The Contractor shall maintain the records of the type and <br /> quantity of refuse received at--the .land fill , the personnel and <br /> equipment used and. the .r-eas of the land fill used. The Con- <br /> tractor- shall furnish io' ­the' <br /> Board of Health,, Free of cost , <br /> copies of these records upon request. The Contractor shall com�. <br /> ply with all state and Local, Regula.tions for operation of the <br /> land fill. <br /> SEPTAGE <br /> The Contractor shall check the Septic Lagoons daily and change <br /> the direction as- -needed and as ordered by the Board of Health <br /> or its engineer.= The Contractor will limit the dumping of ep- <br />