Laserfiche WebLink
5 <br /> s 908 Purchase S#. <br /> New Bedford, Blass. 02740 <br /> TEL 617-996-3388 <br /> GARCIA ENGINEERING, INC. <br /> L888 <br /> 80 <br /> March 1 , 1983 <br /> Comm. of Mass , D # . „ # <br /> Southeast Region <br /> Lakeville Hospital <br /> Lakeville., Ma . 02346 <br /> ATT: Mr , Robert Fagan <br /> RE: las pee Shopping Center <br /> is shpe , MA,, <br /> . <br /> Dear Mr, Fagan: <br /> This letter will confirm our discussions at a meeting held In <br /> i our office on Marc to l and attended the follow*. ng <br /> Robert Fagan, Joel Hartley, Toe Conley, and Harry Bolster of <br /> D. . . H. , Judy Howell. of Field 's Point Corp. , ,and the uer-. <br /> .igned. t <br /> The following was discussed: <br /> l.� Estimated flow figures for existing and proposed construction <br /> were discussed and a table prepared 'by' M,B , Garcia was reviewed <br /> and amended and a revised table re resenting -amendments discussed <br /> is attached, <br /> 2 , The Department previously approved l3, .00 G.P.D. of on--si-te <br /> subsurface sewage disposal e'ptie systems) Anddto . <br /> 15, 000 G.P.D. of septic systems, or total for the slte . ncl ding <br /> outlots in common ownership& of 28,500 G.P.D. r will be permitted. <br /> 3 . The total exis inglaw' ..- s 10.,r .P*D , and the proposed <br /> Mall Retail Addition calls for ars additional r - 0 ,P.D. , or a <br /> total of 14, 2 49 G,P,D. When the ►r to exceeds 15, 00 o G P.D <br /> jurisdiction for review, etc . , will rem to D. * . . <br />