Board of Health Me-eting, September 16, 19 (Page 2)
<br /> 14 . Copy of Town of Yarmouth Landfill. Rules & Regulations, which Judy
<br /> had brought into office. To BE STUDIED AND REVIEWED BY BOARD.
<br /> 15. See Item , phone call through to Town Clerk at home, Exhibit 'A'
<br /> to become, part of the agenda of this �me ting, ; GFB SIGNED WITH A VOTE
<br /> OF 2 to- 01 AS CLERK OF THIS BOARD,
<br /> 16 . Another plan for addition at 39 Ninigret Ave for Mrs. wall, this
<br /> sketch done by KEVIN Hickey of Marstons Mills, who is not licensed in
<br /> this Town, however, plan not explicit without necessary distances and
<br /> does not show what is to be done with existing .subsurface installation.
<br /> 17. Plan for Bruno, wading Place Rd. , by John Jacoby, unacceptable, no,
<br /> signature, distances from ahutte'rs and Bruno well not shown. To BE RE-
<br /> TURNED To JACOBY FOR CORRECTIONS
<br /> 18. Plans, Besse, 13 Broomstick way, for installation of full loath on
<br /> basement level, this will now consist of three full baths. CFB REQUESTS
<br /> THAT MR. BESSE SEND A LET'T'ER To THIS BOARD STATING THE GARBAGE GRINDER
<br /> AT THIS RESIDENCE HAS BEEN REMOVED, THE SYSTEM 1000 GAL COULD THEN SER-
<br /> VICE- THE
<br /> ER-
<br /> I EITHE BEDROOM BATH USE.
<br /> 19 .. GFB had, stated that he had received a call from Rep, Torn Gahir,
<br /> re: testing of wells at Horseshoe Bend way/Tri Town Circle, C.FB had ad-
<br /> vised Tom of our letter to Base and Rep Cahir assured his cooperation.
<br /> 20 . Roy Woodward from Horseshoe Bend way appeared to get clarification
<br /> on well testing, originally to begin on 9/23/85 , revised cyte 9/18/85,
<br /> however, it is our understanding that Falmouth will be done first.
<br /> 21 . Subdivision plans: Winslow Properties: Baord requests explanation
<br /> of primary well -area, or, if individual wells are to used plot distances
<br /> well/septic, if primary well must show nitrate loading: are lots 42-46
<br /> to be developed, pit between lots 28 , 29 ghat is being done to remove the
<br /> illegally deposit of 'material .in that area, send copy of DEE letter of
<br /> inspection held 2/16/83 with memo to Planner, planning hoard, appeals.
<br /> Bayshore, Inc, Red] roo . Rd. OK as .presented
<br /> Bashore/New Seaury: must show MDG drains
<br /> Marsters plan, north side of Ashumet Pond: reiterate memo of Jan 1985
<br /> sent to Planning Board when plan was submitted as "Ashumet Ridge' with
<br /> recommendation that- Planning Bd require that west well be taken at red
<br /> X on plan at drainage ditch, in view of situation to left of project
<br /> To be monitored for volatiles, TCP, hydrocarbons, tetrochlorethelyne.
<br /> Boudreau (Sachem' .Field) located SandwichMashpee line : Request de-
<br /> veloper to show faith and regard for future home owners even though plan
<br /> was submitted just days prior to our 2/8/85 regulation of 150 ' , they are
<br /> to show maximum distances from well/septic. MBG drains required.
<br /> Stable Trust: 150 ' distance well/septic, show nitrate loading of load
<br /> factor as accepted and developed by CCP&EDC .
<br /> Northport Realty Trust: Show distance well. septic, MDC drains, question
<br /> dimension of area, refer to lard use of otic AFB.
<br /> Jonas Drive: Show MDG drains, distance well/septic, land compatibility Otis.
<br /> Steeplechase : Goldberg zoino report for 230 condo units . ,there will be on
<br /> site treatment, High wood water. Plan to be further studied.
<br />
|