Laserfiche WebLink
f <br /> TOWN OF MA9-PEE, BOARD OF HEALTH, MEETING, JANUARY 29, 19 Page two), <br /> VP <br /> THE CHAIR STATED THAT HE HAD NO PROBLEM WITH THE NATURALLY OCCURRING SAND BE- <br /> CAUSE THAT IS WHAT HAS BEEN USED FOR YEARS AND THAT'S NI-lAT IS SAYS IN THE CON <br /> so TRACT. <br /> Mr'. Diftgio warted clarifi.cation as to where he stood with regards to the buying <br /> of the clay and loom,, the contract says it will have previously been stockpiled <br /> at the site. <br /> . BUC IN N ELABORATED ON THE OPINION FROM TOWN COUNSEL AND THE CONTRACTUAL <br /> OBLIGATIONS OF THE CONTRACTOR AND IN THE THE THIRD PARAGWH, 'YOU MAY HOT DE- <br /> DUCT' (STARTING FPM'THE BEGINNING OF LETTER), IN THE SECOND PARAGRAPH, "IT IS <br /> CLEAR FROM THE SPECIFICATIONS OF THE CONTRACT THAT THE OPERATOR IS REQUIRED TO <br /> FURNISH AND PAY FOR FILL MATERIALS NECESSARY TO COMPLY WITH THE SPECIFICATIONS <br /> OF DEQE", -THE THIRD. P H' "IT IS MY UNDESTANDING THAT NSR* DIMAGGIO IS <br /> MAINTAINING THE POSITION THAT HE ANTICIPATED BEING ABLE TO USE MATERIAL FROM <br /> THE SITE FOR THE PURPOSE OF COVER, THIS MAY BE A PRACTICAL VIEW BY MR DIMAGGIO <br /> BUT IT.DOES NOT CONSTITUTE A LEGAL DEFENSE OF AN ORDER BY THE BOARD OF HEALTH <br /> TO OBEY' THE SPECIFICATIONS WHICH MAY IN TURN REQU I PE MR, DIMAGGIO TO INORT <br /> IMPERVIOUS MATERIAL AND SWING MATERIAL IN ORDER TO BRING THE OPEPATION INTO <br /> CffLIANCE WITH THE DEQE REQUIREM ENTS". THE CONTRACT, AS I UNDERSTAND IT FROM <br /> TOWN COUNSEL' VIEW REQU I RES THAT YOU OPERATE THE LANDFILL IN ACCORDANCE WITH <br /> THE MASS, PUBLIC HEALTH DEQE REQUIRMY FOR LANDFILL OPERATION IN WHICH THEY <br /> DESCRIBE AS INTERMEDIATE COVER MATERIAL AND SRALL BE AND WHAT SHALL BE CONSIDERED <br /> S A CLOSING COVER MATERIAL. <br /> DiMa gio: "I have what it says i 'Specifications for Operation of Landfill, <br /> The Board of Health, Town of Mashpee' , and that is where it says, THESE MA- <br /> TERIALS aiAL..L HAVE PREVIOUSLY BEEN STRIPPED AND STOCKPILED AT THE SITE, right <br /> on those specifications". <br /> THE AST CITED THAT A-SO ON THE SPECIFICATION, PAGE 2, UNDER ITEM 2, OPERATION,, <br /> IT STATES; "UNLESS 011HERWISE SPECIFICALLY STATED, THE CONTRACTOR WILL FURNISH <br /> AND PAY FOR ALL MATERIALS, LABOR, TOOLS, EQUIPMENT, TRANSPO ATION, SUPERIN- <br /> TENDANTS, TW ARY CONSTRUCTION OF ANY NATURE." <br /> Mr, D i Nbgg i o fe 1 t there was a contradiction of the documents. <br /> THE AGENT CONTINUED, "SO THEN IT GOES ON AND STATES THAT YOU CAN USE WHATEVER <br /> IS THERE BUT IF IT IS NOT THERE, THEA YOU HAVE TO SUPPLY IT." <br /> M'. DiMagg io asked/stated that if it is there on the acreage that is not berg <br /> u sed, then he shou l dry r t have to buy i t. He asked for the feeling of the Board <br /> he wanted to know where he was at right now, so that he knew what he was up a- <br /> gainst <br /> - <br /> g .inst and whether he had to bring a counsel in on this,, he persona I ly feels <br /> that he has worked this dump more than it has been worked in the past twenty <br /> years. He c 1 a i res he has a maz i mum amount of work going on there and that he <br /> had three to four hundred yards of metal left by the previous contractor, which <br /> was not his respons i b i l i ty, in addition, he rep l aced the tra i 1 er that was on <br /> site because the previous one was not fit for han hab i tati on, it was left in <br /> there with a stove converted frm a smll oil dnn, it might suffice some peo- <br /> ple <br /> e - <br /> ple but he soesn't operate like that. The exposed area of garbage along Asher <br /> Path was placed there years ago and is now being gashed away, becaue the slopes <br /> were a straight drop-off and not. ar B to 1 slope the way it is supposed to be. <br /> THE CHAIR SAID HE WOULD LIE TO ANSWER HIS THINKING NG AS A MEMBER OF THE BSD, <br /> HE HAD GONE INTO THE DUvP AND RODE AROUND, SAW DIMGGIO'S MEN BUT DIDN'T TALO <br /> TO ANYBODY: HAVING SEEN THE LANDFILL UNDER TSI I S BOARD AND UNDER OTHER CONTRAC- <br /> TORS, HE WAS NOT HAVING A G REAT PROBLEM WITH TH THE LANDFILL, THE REASON THIS IS <br /> COMING ON IS BECAUSE OF WATER PROBLEMS ACROSS THE STREET, DEQE IS I NVO LVED AND <br /> THEM ARE ON OUR BACK. "I'M LOOKING AT WHAT YOU HAVE DOME AT THE LANDFILL AND <br />