My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/25/1988 BOARD OF HEALTH Minutes
>
4/25/1988 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:31:34 PM
Creation date
3/23/2018 2:03:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
04/25/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TOWN OF MASHPEE <br /> BOARD of HEALTH <br /> MEETING <br /> alomtIng called order at 3:00 pm. APRIL 25b, 1988 <br /> Mnbers present', all <br /> THE TAPE IS NOT TO BE CONSIDERED PART OF THE MEETING, IT IS FOR THE PURPOSE OF TRANSCRIBING THE MINUTES. <br /> 1, Warrants signed. <br /> 2. Minutes of April 19, 1988 meeting approved. M tion GRC, second' LW. <br /> 3. Copy, letter DEE to Vita-Bac Go re: inquiry as to sludge disposal. Letter concurs w80ard that the dis- <br /> posal of greases ludge is up the owner of the property. B -! is aware of the-Sewer Can. working on the con- <br /> tract w/Upper B-lackstone. C: sent copy of letter to Pilgrim's Pride as it indicates Greater Lawrence may <br /> accept the loads. <br /> 4. Notice, DEE Public Hearing 5/2/88 New Reb Re; 5 i to Ass i gr ent for Transfer er Stations. Weston & Sampson <br /> notified BOH of rew reps being proposed. Reason why site assignent for our T.S. has been scheduled for <br /> 5/2/88 at 3:00 pm. <br /> 5.Copy, letter Dufresne-Henry response to DEE non-can 10 once at F i e i d's Point Treatment P I a rt.CFB stated <br /> that again, theyre not showing contract /disposal facility for. the sludge, it states the possibility of <br /> a contract. Purchase orders are#out for spam,parts. footed. L <br /> ' me '4 � <br /> N <br /> 5, Letter Pilgrim's Pride to CFB & GRC re: status of septic system. Previously discussed in #3. <br /> . Copy, Letter BOH to Di ftg io re: -end of Contract.- MC- stated that DlMagg io sys we are holding a 10000 <br /> bond not $15000.CFB stated that the-Accouritant i rrf om ed him that we were holding-$15000, D i agg i o might have <br /> r posed a $10000 for the extension of the contract proposal. <br /> . <br /> Copy, letter BOH to Weston & SaTpson requesting inspection and.° rade e l ev t i oris for the end of current <br /> contract and the transfer of Operations. Noted. <br /> 9. Copy new insurance coverage proposal for town ff p l oyees, at i c l e at Town meeting. Noted, <br /> 10. Copy, Private Well Regulation. Noted. Chair asked to inquire w/Reardon as to status of his review of <br /> the Prvate Well Regulation submitted to him on 3/31/88. Research submitted by alloy's neighbor on Whip- <br /> poorwill <br /> hip- <br /> po r ill circle. BOH adopted regu 1 at i ori on 1182 which states "one lot- one well". EAM stated that the <br /> neighbor heard the discussion when Malloy was in that through an easement ( alloy may be able to bring <br /> potable water to#166. "No variances will be granted from this Reg", <br /> Discussion followed wCFB informing the BOH of the work the County had done in creating the proposed Well <br /> Regulation to creat un i foam i ty among a l 1 the Cape Towns. <br /> 11. Copy "Private Well Contamination in Massachsutts", sources, Responses -and Needs. booted. <br /> Discussion fo l l owed wRC questioning whether Virgilio is properly string and mixing the road salt he uses. <br /> FB informed him of the berms in. the DPW Bldg to prevent salt intrusion into the groundwater. It's supposed <br /> to be stored and mined inside the bldg. It was a struggle to have the pile moved from th senior Center and <br /> when the new bldg was cep l eted, it was to be stored in it according to the State Reg s. <br /> 12. Copy "Cancer Control in Massachusetts a Blueprint for Action", noted. <br /> 13. Plans, Preliminary Subdivision Approval, Field's Poirrt Limited Partnership: 1.Map99 lots 35,36,37 0 lots) <br /> . Map 3/lots B, 12,13 & Map 80 lotsl,2 (52 lots), 3. Map 3/lot 10 & Map 74/lot 23 18 lots). <br /> Chair staid that we should request location of septics and waterlines. Also NDC type roaddrains will be <br /> required.. send letter* GRC questioned the impact of all the propsed septics on the groundwater. EAM was <br /> informed by Fields Point that all three devs. will be using Highwood water. <br /> 4 15 Taken together at the request EAM. Title Variance request 23 dace bon '9 Jackbon Rd. <br /> and decided that although the sideline variance are toward open space, the Owners f the open space <br /> should be granted the opportunity of a hearing to voice their opposition to such a variance. Board agreed <br /> to have Cape&Islands notify the abbutors oa a hearing at the earliest passibility. <br /> Nbeet i ng adjoumed at : - tarporar i ly until Dr. Silva showed up for his app i ntnent <br />
The URL can be used to link to this page
Your browser does not support the video tag.