Laserfiche WebLink
-2- <br /> a p TW annually since 1980. ion to approve RLI , second RGC, stipulation that abutting wells -be precc i se 1 <br /> } <br /> located and EAM to inspect installation* and deep hole observation. <br /> . Pre l im i a r Subdivision Plan, Cape Islands for Ra msey M rsters (M41/L77j7A MO/L20 34Lots. . <br /> Planning Bard to include: 1. NDC type Road drains; . Septic and W41 locations to be indicated <br /> r� Plan; 3. filet 1 ands if any be indicated on plan and 4.adv i e. that 'an -ERA 624 later test and wa i ver will be <br /> required before building permit will be signed off by BOH. EPA 624 test wells will also be required prior <br /> final subdivision plan approval by BOH. RL 1 CRC quest i ort.the dra i nage ditch running down the center of <br /> r <br /> plan. Suggest that ConCcm, Planner and BOHvisit the site o drainage ditch. Further ca ent reserved until <br /> after site visit. <br /> 18. Prehmin&y Subd 1 v 1 s i ori P 1 an, Cape 'I s l ands for Essex Realty Trust. (F28/L15 V29/Ll) 40 Lots. <br /> RCC stated that this is the Rod & Gun Club Property and Mr Dingham's property. Sale is pending approval of <br /> subdivision plan. CC questioned how they can subdivide samething they don't own. Wants rare time before he <br /> comments on it. Reserve ca eats, to be rescheduled in two weeks. <br /> 19. Preliminary Subdivision Play, BSC Group for Cornish & Fields Poirrt (M73/L5j2.,13 & MBO/Ll 3 2 55 Lots. <br /> Comments to Planning Board - 1. MDC drains, 2. Septic & well locations or Highwood Dater Lines, 3. Designation <br /> of Wet l ands <br /> 20. Preliminary Subdivision Plan, DSC Group for Fields Po i ft, (M73/L10 L230 20 Lots. <br /> GRC: issue same co Tents as for #19., <br /> APPOI MME NT'MENDELSOALAN INDUSTRIES) FOR THE INSTALLATION OF A SEPARATE SEPTIC SYSTEM TO SERVICE A <br /> Co+IERCIAL DISSHER. <br /> Title M application first submitted under Mr. Mendelson's name. RCC informed them that it had to be submitted <br /> under Kirrane's name sinc he owns the property. Kimane' refused to let Alan hook into existing system although <br /> 4 <br /> it could accomodate additional flag because each sy tm serves two buildings and if it would fall, the tennar�ts <br /> Le <br /> ld have share the repair cost aeeodin t the of space rented. '1 Checked wDEE and was infoTed that <br /> additional flag would not be considered an expansion of the plans originally submitted. Expansion means <br /> itional buildings. GRC stated that the BOH would be involved in the inspection aswell as the engineers. EM <br /> stated that the plan is for the use of a commercial dishwasher and nothing else. we had heard about the pos- <br /> sibility f a linen washing machine. Discussion followed concerning whether or not a "laundry" could be in- <br /> stalled <br /> n- <br /> stall d aswe l l. Mende 1 son was informed that DEE would have to approve the hoar up of a washing machine since <br /> this could construed as a ca mrc i a l laundry. ,Further, she was i nfor m d that it would b cheaper to install an <br /> adequately sized system for the laundry at this time and wait for DEE opinion, rather than core back after <br /> DEE comment and' ask to put in a larger system. DEE might consider this additional flow as expansive and <br /> therefor perhaps deny. Plan as proposed estimates ar flow of 240gls/day. She was informed DEE can tape up <br /> to 45 days to approve. Conclusion was to vote on plan as submitted. Installer can came dawn and pull permit <br /> if BOH votes to approve. If you later wish to change plan and enlarge to accept dishwasher, you can resubmit <br /> new plans+before installer palls permit. Notion to approve plan RLW, second RCC for; dishwasher only. <br /> APPO10ENT - LARD NI KULAS TEMPORARY PRIMATE WELLS FOR SUBDIVISION <br /> Subdision: Pimlico Heights, approved 1/6/8B with central well system. Nineteen abouting lots are located in <br /> Sandwich. <br /> LN: Deqe has no problem /one central well servicing lots in both towns. This must be ok'ed by you. Would <br /> you allow us i n star I l five or six temporary wells while we are waiting for DEE a pprova 1 of the central we l l <br /> which we expect to have approval on around Sept.? We'll still be putting in all the lines. <br /> Eft our precedent in Winslow Heights, when we a1lawed temp wells awaiting public water. This is different in <br /> that the public water is replaced w a central wel1ft <br /> ROC: Why are you going a central well? <br /> LN: This plan has been around for about 18 n the and back then Sandwich said to put in all the water lines, <br /> nd i ch was thinking of connect i rig their water to Pimlico Pond. I want six temp, well installed for a <br /> les office and I have a few lot sold. It's a question of timing, so that I can keep ray guys busy unci l-DEQE <br /> approves the central well. <br /> ROC: I have no objections if you can met the distance between septic and wells on the five lots. We need elear- <br /> rance frm DEE first. <br />