Laserfiche WebLink
I <br /> MINUTES Parch 1, 1990 4 BOARD OF HEALTH <br /> creation of the 41 by adding a foot of fill and commented <br /> this is not- naturally occurring pervious material, <br /> Pr. Sanicki stated the system will be placed in <br /> naturally occurring soil and is in pervious soil . In doing <br /> so, just marginally, the break-out cannot be net without <br /> lifting the system which is the purpose of the containment <br /> structure. <br /> Pr, Greelish stated as the current septic system is on <br /> the abutting lot and revised plans do improve the health and <br /> environment in the area he would recommend this Boards ap- <br /> proval , conditional upon the State's approval , however this <br /> Board will forward its recommendations to the Board of Ap- <br /> peals to deny the request for ars addition in concurrence with <br /> the State's request and require the owner to dismantle the <br /> addition, Mr, Greeff.ish explained this Board will approve -the <br /> upgrade to Title v only, <br /> Pr* McQuaid stated revised plans do not delineate ad- M <br /> 3usted groundwater elevation based on U.B. .B. data. <br /> Mr, Sanicki stated on behalf of his client he is re- <br /> spectfully requesting this Board to approve plans and forward <br /> revisions to the state for their considerations. <br /> Mr. Greelish motioned to approve revised plans, condi- <br /> tional upon D.E.P. approval., however this Board will forward <br /> its recommendations to the Board of Appeals to deny the re- <br /> guest for an addition and require dismantlement of the add -. <br /> tion, no second was motioned, motion failed, <br /> Mr, costa motioned to deny revised plans as presented, <br /> Mr, Doherty seconded, all agreed. <br /> .APPOINTMENT: cape & Islands - Title v variance, 2 Great <br /> .ver Road, Sylvester <br /> Mr, David Sanicki, Engineer for Cape & Islands Survey- <br /> ing, was in attendance, as well. as, Pr. Sylvester. Where <br /> were no abutters in attendance. <br /> Ir. Sanicki presented to the Board certified mail re- <br /> ceipts. Pr. Sanicki informe d -the Board three lots were com- <br /> bined into one parcel by deed. A cottage resides on the <br /> abutting property, which was also combined from two 251 <br /> strips to one parcel. Mr. Sanicki relayed the existing cess- <br /> pool has failed, this Board has requested an upgrade to Title <br /> V. No wells are located within 1501 of the proposed leaching <br />