Laserfiche WebLink
� ti <br /> Page B.o.H.Minutes7Z19Z90). <br /> . Recei t of final DEP approved treatment alant plans <br /> Cranberry Hollow. EAM indicated that now that we've received <br /> a copy of the DEP stamped and approved plans, we have all the <br /> necessary paperwork to issue a Disposal Works Construction <br /> Perot, the fee for which EAM had not yet worked out. This is <br /> a 297 bedroom condo project proposed for in between Noisy <br /> Dole Road and Meetinghouse Road. Meeting interrupted to dis- <br /> cuss 7 : 15 Appointment w/ Greg Reran who was a no-show" . <br /> APPOINTMENT: Greg Ryan, Landfill gate attendant. comDlain.t <br /> Although requested to appear-, Ryan did not. As a result of <br /> this noncompliance to our request, SJG recomended revocation <br /> of loth Ryan JrIs and the original sticker. Witnney ex- <br /> plained, in detail what problems he had had with this indi- <br /> vidual bringing in more than what would be considered normal <br /> residential loads of brush, Witnney indicated that Ryan <br /> threatened hist personally,EAM wished to go on record as stat- <br /> ing that we should go on record as supporting a gatekeeper <br /> such as Witnney, as he controls access to the landfill com- <br /> mendably. SJG motioned to revoke the permit #5445 and so in- <br /> form Ms. Ryan and the contractor. Upon clarification, the <br /> permits revoked are loth issued to this household. They may <br /> request a hearing before this Board. <br /> . Cont'd. EAM informed the Board that it normally requires <br /> a copy of a contract with a sludge hauler outfit before we <br /> sign off on a disposal permit. Bonding requirements were <br /> questioned by JTD. OOE questioned entering into the same <br /> problems we encountered with Southport, etc, re: interim <br /> systems. . . EAM suggested forwarding a letter indicating our <br /> preliminary approval of their plans, however, they should <br /> come before the Board to fully ,explain their plans to see <br /> whether they meet our approval, . (Discussion ensued re: <br /> Southport project, in particular JTDIs concerns. ) <br /> APPOINTMENT: STEPHEN COLELLA, Addition to 36 Bayview Rd. Mr. <br /> olella did not show up. EAM informed the Board that Colella <br /> had not come to the Bldg. Dept, to renew his Bldg. Permit as- <br /> he <br /> had said he would, neither has his engineer contacted this <br /> of five to set up a perp date. EAM recommended that the Board <br /> request that the Bldg. Dept. post a 'stop work" and a "no oc- <br /> cupancy" order on the building. JTD agreed that it appears <br /> that Mr, Colella is not cooperating and not doing things as <br /> promised. JTD motioned to follow agent's recommendation, SJG <br /> seconded. <br /> 8, ) Vote to approve variance re west - . Regan, 181 <br /> Timberlane (previously approved but not voted on Due to an <br /> illegal duping citation having been issued against G, Regan <br /> Jr. a permit had not been issued. JTD questioned whether the <br />