My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/02/1990 BOARD OF HEALTH Minutes
>
08/02/1990 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:49:05 PM
Creation date
3/23/2018 2:59:27 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
08/02/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i t <br /> MINUTES August 2 , 1990 5 BOARD OF HEALTH <br /> ,ung engineers review the hydrogeo analysis for comment. <br /> lir. Costa questioned funding. It was discussed that New <br /> seabury should fund costs for review. <br /> . Cpof B.O.H. comments on Otis muniti-ons dept - Mr. <br /> McQuaid stated a meeting is scheduled next Wednesday at 2;00 <br /> p.m. to meet on -site. <br /> Mr. Evans stated he is satisfied with the safety aspects <br /> of the proposal . <br /> Mr, Greelish relayed he would like item #2 in the com- <br /> ments adhered to. <br /> . Fetter from,, renier re: As built .plans for Coombs <br /> school - Mr, McQuaid informed the Board he received a call <br /> from Tibbett's Engineering, who submitted original septic <br /> plans) , questioning if this Board would accept an 'AAs Built" <br /> from them. They intend to shoot the elevations and submit <br /> the tlAs Built" . fir. McQuaid stated he girl relay this would <br /> be acceptable. In spearing with Tibbett's Engineering it was <br /> relayed Eastern Contracting did excavate pit #10 and correct <br /> the elevation. Mr.. McQuaid stated he diel question Eastern <br /> Contracting as to whether the engineer was licensed at which <br /> time theme response was "they were unsure" , Mr. McQuaid com- <br /> ented, an unknown correction of Charles owley's "AsBuilt" <br /> would not be acceptable. l recommended Tibbett's engineering <br /> contact Eastern Contractor's, Charles Rowley and myself to <br /> verify the elevations of pit #10, <br /> Mr, Greelish motioned to direct the Architect that his <br /> current avenues will be to hire Tibbett's Engineering to cer- <br /> tify Tibbett's plan or provide an "As Built" from the in- <br /> staller with certification from Tibbett's engineer, Mr. <br /> Doherty seconded,, all agreed. <br /> 10, ) Pro osed olio re: Certificates of Inspection - Mr, <br /> , <br /> McQuaid informed the Board this proposed policy is a direct <br /> result of the anonymous letter received by this office re- <br /> garding sea Mist. 1 <br /> Mr, McQuaid stated this is a requirement of the state <br /> Bldg. Code however, the Bldg. Dept, has not been conducting <br /> these inspections. It is the Bldg. Dept's opinion the Health <br /> Department be involved in these inspections. Mr. McQuaid re-� <br /> layed he is agreeable to this request however, will hold re- <br /> tail and food inspections separately. <br />
The URL can be used to link to this page
Your browser does not support the video tag.