Laserfiche WebLink
S <br /> asked Mr. Harrington if he was in agreement with this request.. <br /> Mr. Harrington replied that he was in agreement with this request. It should also <br /> be stated as to whether the system is general, provisional or remedial. <br /> Mr. Shay agreed that that was a really good idea. He has a sticky situation in <br /> Falmouth where when they first went over the year 2000 deal and the Zone II <br /> required that they have a denitrification system for these lots. 'Things were a little <br /> unclear and the sign-off for the first systems IEP carne down with four- or five <br /> different systems in' Falmouth. They sent them off to Lakeville. The folks up there <br /> versus the people in Boston signed therm off. People were corning fast and furious <br /> at you because they needed their building permits. They are battling one were they <br /> are trying to chase down the record keeping. <br /> i <br /> Mr. Harrington asked Mr. Shay if that was a provisional approval. <br /> Mr. Shay confirmed that it was a provisional approval. <br /> Ms. warden continued that this is something that they haven't done. She had <br /> urged the BOH in the past to do this and it hasn't been complied with to date. <br /> Ir. Doherty stated that she should remind them if they do forget to add that mito <br /> the motion. <br /> Mr. Santos asked if there was ars updated corer letter to address the changes in <br /> the initial letter that was sent. <br /> Mr. Shay apologized for not bringing an updated letter. He suggested that they <br /> read the variances off of the engineered plan. <br /> Mr. Santos made a motion to approve the following variances for 128 Uncle Per y's <br /> Road: The variance to reduce the separation of the bottom of the SAS-a two-foot <br /> variance. The variance to reduce the setback from the SAS from the foundation-- <br /> 10'. They will install a40-mill liner against the foundation to seal it. The variance <br /> to-utilize Micro-Fast 0.5 System to reduce 0% of the nitrogen from the sewerage <br /> disposal system under remedial use. A UV shall be included in the o & I i <br /> maintenance contract for the life of the system. A variance to install a septic <br /> system within a Flood Zone A-13 of Land Subject of Coastal Storm Flooding. The <br /> local variance is to allow the use of a mounded system for the repair of the septic <br /> system. The mounded system is necessary for groundwater separation. Mr. <br /> Doherty rty seco nded the motion. Motion passed. <br /> DISCUSSION: <br /> B. 35 So. Sandwich Road <br /> Mr. Harrington began by stating that Chris Costa is not here. But this is a minor <br /> revision. At the request ofI I regarding the location of the wells across the street. <br /> Mr. Doherty asked if Mr. Costa had located the wells on the engineered plans. <br /> 15 <br />