My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/21/2002 BOARD OF HEALTH Minutes
>
2/21/2002 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:21:56 PM
Creation date
3/26/2018 1:14:11 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
02/21/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i 4 <br /> Nis. warden asked the BOH members what-they granted to do about the contract. <br /> Mr. Santos asked if they put this out as an actual bid or did they just request <br /> quotes. <br /> Nis. warden replied that they request three proposals. This is what they received <br /> back. <br /> Mr. Santos asked if this was the lowest one. <br /> Mr. Doherty asked who else responded. <br /> Ms. warden replied that Weston & Sampson did not include the repair of the <br /> monitoring wells in their contract. Woodard & Curran came in at $39,000.00 and <br /> Weston & Sampson carne in at 1,00 . 0. <br /> Mr. Santos asked if Stearns &wheeler cam in at $39,000.00. <br /> Mr. Harrington stated that they did not do Stearns &wheeler. <br /> Mr. Doherty asked who else responded., <br /> Mr. Harrington replied that Green Seal responded however they never replied <br /> because they never gave them any actual quotes. They gave the BOH hourly prices. <br /> They didn't accept that. They went with Weston & Sampson and with Woodard <br /> Curran. Woodard & Curran was chosen by the landfill. <br /> Ir. Doherty stated that he was comfortable with the contract. However, if Mr. <br /> Santos had questions he didn't mind holding off on the decision. <br /> Mr. Santos again asked if the $39,325.00 included the replacement of the two <br /> reU . <br /> Mr. Harrington replied that it didn't include the replacement of the wells. <br /> Ms. warden stated that it dict state that on the contract. <br /> Mr. Harrington stated that that was his original question that he posed to Mr. <br /> Santos. The replacement of wells with a cost and thea another section lists wells <br /> with a cost of$6200.00. <br /> . Mr. Santos would like the well repair information clarified. His problem with this i <br /> if they were going to $6200.00 to repair two wells. why are they going to spend <br /> $2150.00 for 22 hours to do the same thing? <br /> Mr. Harrington stated that he really didn't want this on here either. if they do <br /> decide to get their own well driller. { <br />
The URL can be used to link to this page
Your browser does not support the video tag.