Laserfiche WebLink
. The Flat Pond subdivision <br /> Mr. Santos stated that he received a letter from cape cod Commission <br /> that stated that the Flat Pond subdivision for New seabury was denied. <br /> Apparently New seabury didn't even shover up for the hearing. This was <br /> one of the things that preceded lir. Harrington's arrival. There was the <br /> crunch tolme before 2000. Everyone was coaxing in and getting their lots <br /> grandfathered. All around Flat Pond there were 17,000 to 20,000 square <br /> feet lot they wanted to build tour and five bedroom homes. This is a very <br /> small pond. There was a major concern. Mr, Doherty and Mr. Ball stuck to <br /> their guns in this matter. This was before Mr. Santos was a board <br /> member. They treated like it was a Zone 11 and it didn't fly. He hasn't been <br /> out there in a long time. However, he didn't believe that it would stand up <br /> against four or five bedroom houses all around with those small lots. <br /> T* Unlicensed septic Installer, Libber and David Pike 32 surrey Place <br /> Mr. Pike began by reviewing the situation at band. He had a letter of the <br /> events for each BOFI member to review. An initial septic permit ##8333 <br /> was issued to ca ossa Excavation for Donna Panarello owner of record at <br /> that time. The property was transferred from Panarello to Daisy Realty <br /> Trust. Libby Pike is the trustee* on August V, 2001, a building permit was <br /> issued to Daisy Realty Trust* David Lammers was the builder of record at <br /> that time. on February 16', 2002, Mr. Matthew Crocker installed the <br /> system at the request of Nor. Lammers and on this same date Mr. Lammers <br /> instructed Mr. Pike to pay Mr. Crocker. He did pay Mr. Crocker and <br /> presented a copy of the cancelled check. on February 19, 2002, at Mr. <br /> Pike's request Mr. John Slavinsky of cape & Islands inspected the system <br /> and-informed him that it was- in conformance. Shortly thereafter they had <br /> the system covered and later landscaped. The builder moved on to other <br /> projects and Mr., Mike McCue replaced hire. In May of 2002 Mr. Pipe <br /> became aware of a septic compliance problem. He contacted-Mr. Crocker <br /> and Mr. Pike was told that an as built carol would be submitted. Mr. Pike <br /> contacted him a second time with the same result, During that <br /> conversation Mr. Puce asked Mr. Crocker if he was licensed in I ashpee. <br /> He said although he wasn't currently licensed in llashpee. He was <br /> licensed when the installation was done, because Mashpee BOH operates <br /> on a fiscal calendar and his license for 2001 was valid through March 31", <br /> 2002. Mr. Pike stated that if itwasn't true it sounded like it was fraud. <br /> They left another message for Mr. Crocker in .July of 2002 and it was not <br /> responded to. <br /> Mr. Harrington stated that he checked and it wouldn't appear that Mr. <br /> Crocker had a 2001 license. Regardless it would have runt out at the enol <br /> of the calendar year. The certification was never provided. It was not <br /> i <br /> provided because he was not the original installer who pulled the permit. <br /> They gime out the as built cards to the individual who pulls the permit. <br /> { <br /> Y <br /> r <br /> s <br />