My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/5/2002 BOARD OF HEALTH Minutes
>
9/5/2002 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:56:10 PM
Creation date
3/26/2018 1:41:18 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
09/05/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Mr. Harrington confirmed that the reserve would be constructed at the <br /> sane time. <br /> Mr. Sall asked how much he was under, 550 GPD? <br /> Mr. Harrington replied that her was alloyed 600 GIRD. They were only at <br /> 300 GPD, They are using only half of what they were allotted, Another <br /> condition that he would like attached to the approval is based on the <br /> three bays located in the basement of the property. He wanted to be <br /> explicit about no repair work to be dome in these bays whatsoever. There <br /> is a retail first floor with 3500 squame feet of retail and then the three <br /> storage bays. <br /> i Mr, Ball asked what type of retail was going to be in the building. <br /> Mr. Harrington had no idea.. <br /> iMr. Ball asked why he wanted no repair down there. <br /> i <br /> i <br /> Mr. Harrington replied that those storage bays usually lead to people <br /> doing repair work. <br /> Ir. Ball asked hire what he was afraid of. <br /> Mr. Harrington stated that he was concerned with potential for oil and <br /> hazardous materials, The use of those materials would kick-in the need <br /> for floor drains and tight tanks and other requirements that they were not <br /> getting into at this time because they are listing them as storage bays. <br /> This way they have a condition if they do start doing repair work they <br /> could revoke their .#. <br /> Mr,, Bail suggested that they kick it up a little and include repairs, <br /> pesticides and fertilizers with none to be stored down there, The BOH <br /> was here to protect. They were giving therm something by not requesting <br /> tight tanks and all the rest. <br /> Mr. Harrington didn't know what type of retail it was going to be. <br /> Mr. Sall reiterated that this would cover then. " <br /> Mr. Harrington stated that what has driven this issue is his experience in <br /> Barnstable where too many of them have gone from warehouse to repair <br /> in a hurry. 'then it turns into a business. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.