My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/5/2002 BOARD OF HEALTH Minutes
>
9/5/2002 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:56:10 PM
Creation date
3/26/2018 1:41:18 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
09/05/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M <br /> Mr. Hahar asked if he could have the six-months at first. Then they could <br /> go with the three-month extension from there just to give hire a little <br /> more time to see what develops, <br /> Mr. Ball reiterated that all that was required at the three-month mark is a <br /> phone call to Mr. Harrington advising hien as to the statins of their <br /> progress. They could have the whole year. <br /> Ms. Warden stated that they needed to come before the BOH. <br /> Mr. Santos reiterated that they should pint something in writing and donne <br /> in front of there to discuss the particulars. He didn't rant this dragged <br /> out for years. <br /> IIIb. Najjar stated than he was the type that if he had to do something. He <br /> liked to get it done and over with. If this was something he knew a little <br /> hit more about he could come in and feel more comfortable, That was <br /> why he was asking for a little more time. But, he will comply with the <br /> board's request and they should be harpy with what they do. <br /> Mr. Bali made a motion to grant the variance requested to extend the Eco <br /> GPD regulation for three-months under the stipulation that they return for <br /> an extension at which time a proposal regarding the type of septic <br /> system that is being planned for this property. The construction phase <br /> will begin no later than twelve months from this date. Ms. Grady <br /> seconded the motion. Motion passed. <br /> APPOINTMENT: Carpe & Islands Engineering 76 Seconset island Toad <br /> Mr. David sairnicl i was present representing the applicants for 76 <br /> seconset Island Road, He Degan by stating than basically it was a sane of <br /> a property with a cesspool septic system, which they are proposing to <br /> upgrade to a Title V septic system to an existing three-bedroom house. <br /> What they tried to do is put a new septic system in the back corner of the <br /> lot. They have to contend with the existing foundation of the basement. <br /> He was requesting a five-foot variance to the property lime. This was right <br /> at the end of the Little Diver Burt Yard. It was the last house before you <br /> go into it. As you look around the back of this property on either side all <br /> the gay up is Little Diver Boat bard parking area. <br /> Mr. Ball stated that they were way away from the wetland. <br /> Mr. sanic i confirmed that they were well away from the wetland. <br /> Mr. Ball asked if this was a three-bedroom-.and where-they-leaving it a - <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.