Laserfiche WebLink
i <br /> Mr, Harrington stated that they are in Popponnesset and there shouldn't <br /> be any wells. <br /> Mr. Ball made a motion to approve the variances requested by David <br /> sanicki of cape & Islands Engineering. The variances are as follows: The <br /> SAS to the street Property line will be zero feet. The SAS to the cellar <br /> wall will be three feet. The bottom of the SAS to high groundwater will be <br /> one foot* This was also approved with the addition of an outside liner on <br /> the cellar wall and a foundation sealer. Ms. Grady seconded the motion, <br /> !Motion passed* <br /> 11. Re-approval for I/A System ( - 6 Route 28 Santult Inn: <br /> Mr. Harrington began by stating that the Santuit Inn is over 600 CPD. This <br /> is a failed system, The owner approached the BOH to have the system <br /> designed. He also made them aware that because they were over the 600 <br /> GPD that if they were ever going to sell the property they would have to <br /> install a denitrification system* Mr. Doyle of Doyle Associates first came <br /> in and presented a plan with the fast system for_the sane number of <br /> bedrooms and the same type of set up. The first time that he cane in he <br /> had the FAST system approved and also had the reserve area built out at <br /> the same time. He wanted to see if he could obtain a variance to avoid <br /> the 600 GPD requirement. The BOH refused his request because he was <br /> within the Popponnesset recharge area. What he had suggested to the <br /> Bpi at that point, because it was a remedial situation, the BOH allow <br /> therm the % reduction, which they are allowed because of the <br /> innovative alternative system and also grant the variance to not install <br /> the reserve area. His basis for that was because they were producing a <br /> much higher quality effluent. The leaching should work better, You have <br /> much reduced total suspended solids. Your nitrogen is already removed <br /> to a point. The existing well in the property was evaluated for future use <br /> as the sampling point to meet the regulation as far as the total nitrogen <br /> requirement, All of that was in place. He didn"t know ghat the problem <br /> was with the FAST system. The owner contacted Chris Costa to switch <br /> over to the re-circulating sand filter. That is the request before the BOH. <br /> He has reviewed the plan and the monitoring requirements, It is all pretty <br /> much standard. <br /> Mr. Santos asked if this was the property that had the well they were <br /> using for sampling. <br /> Mr, Harrington stated that that was correct. The well was their potable <br /> well for a long time. The sampling of that well where they were using it as <br /> a Potable well newer showed nitrates above 3 PP M. <br />