Laserfiche WebLink
i <br /> 4 <br /> The board members forwarded their signatures to the emergency <br /> certification form for approval. <br /> APPOINTMENT: 400 Nathan Ellis Hwy <br /> Mr, John Hutchins was present for this appointment, Mr. Harrington stated <br /> that the design flow is 330 gallons per day, They are allowed 361.7 <br /> gallons per day that is why there is no denitrification system. <br /> IVIS. Warden noted that the plans were great. They did a nice job with the <br /> plans. They have the catch basins and they were the MDC type of catch <br /> basins. <br /> Mr. Harrington added that they would need a contract to maintain therm. <br /> Right? <br /> IVIS. Warden agreed with Mr. Farrington that that was correct. <br /> Mr. Santos asked if they were a deep hooded catch basin. <br /> Mr. Harrington confirmed that that was correct. <br /> Ms. Warden measured from the BVW and it was over 1001. she completed <br /> that task today. <br /> Mr. Santos asked it this was going to be a slab, <br /> Mr. Harrington confirmed that that was correct. <br /> IVIS* Warden statements all assigned and the Zone 11 calculations, she felt <br /> that they did an excellent job. <br /> Mr. Harrington added that because the vera was less than 10" to the <br /> property line. He had therm put a carbon filter on the vent. There is also a <br /> note stating that the primary and reserve systems to be installed at the <br /> same time. <br /> Mr. Santos asked if in the past they were required to have a bull run value. <br /> Mr. Harrington agreed that that was correct. <br /> i <br /> Mr. Santos asked if that was noted on the plans. <br /> Mr. Harrington pointed it out on the plans. He continued by stating that <br /> they have oil absorbent pads required in MOC type catch basins to be <br />