Laserfiche WebLink
1 <br /> ultimately had the administrative consent order. He was going to draft a <br /> letter to the DEP to request that they not sign off on any more sever <br /> extension for New Seabury until they ultimately fulfill their contract to tie <br /> in the Bluff Cottages. He has also requested Ms, Turano-Flores to also <br /> write a letter of support on the board's position from the Bluff owners, <br /> Ultimately the Bluff owners have stated through other counsel that they <br /> are looking to pick up the tab to get the line out there because they are <br /> all going to gain for having a sewer line. The three bedrooms will <br /> ultimately go to six-bedrooms. <br /> Mr. Ball asked Mr. Grotz a if he had a cover letter for this request* <br /> Mr. Grotzke responded that he had submitted an original cover letter and <br /> it should be in the file. It was everything that they had discussed. <br /> Mr. Ball made a motion to approve the variance requested ars fellows: An <br /> eight-foot variance from the septic tank to the property line. A .05 foot <br /> and two foot variance from the SAS to the property line. An approval for <br /> the FAST denitrification and UV system with a two-year quarterly testing <br /> for nitrates. Mr. Santos seconded the motion. ( lotion passed. <br /> Variance Request- 134 Popponess t Island Road, Carpe & Islands Eng. <br /> Representins: <br /> Mr. Harrington began by stating that he had already approved this <br /> variance request. The board's failure to meet over the last month was <br /> holding there up. <br /> j Mr. Santos asked if this was 5 through <br /> Mr. Harrington reiterated that this was 134 Popponesset Island Road. He <br /> spoke with Mr. Sani ki. He basically granted Mr, rani ki the variances <br /> based on the standard regulations. They have to submit the o & Illi. Mr. <br /> Harrington will witness the bottom the hole when they do it and septic <br /> installation. <br /> Mr. Santos asked if this was a new installation. <br /> Mr. Harrington responded that this was an upgrade of a failed system <br /> that was not going to be corrected at the time of transference of the <br /> property. A special agreement was constructed with the help of the <br /> applicant attorney regarding the repair of this system. <br /> Mr. Ball matte a motion to approve the Title I design plan as revised on <br /> February 24, 2003, Frith the following conditions: The health agent shall <br /> witness a soil evaluation and bottom of the hole of SAS prior to <br />