Laserfiche WebLink
1 <br /> installation, An operation and Maintenance agreement shall be provided <br /> to the Board of Health prior to occupancy of the dwelling. The o <br /> shall include analysis for total nitrogen on a quarterly basis for the first <br /> two years of operation. The septic installation shall be completed <br /> according to the enforcement agreement between the applicant and the <br /> town of l lashpee Board of Health. Mr, Santos seconded the motion. <br /> Motion passed. <br /> . Variance Request - 22 Taffrail Wim[ <br /> Mr, Harrington noted that he had the following variances to be reviewed <br /> at the meeting: street variance of nine feet required not four feet. <br /> Trenches should be H-20 re-inforced not H-10. septic tank must be raised <br /> out of groundwater or replaced with a watertight tank. Perk test required <br /> prior to installation. Specify pump chamber and provide uplift <br /> calculations for pump chamber. Request a variance to provide a mounded <br /> system. Show location of existing system, !Vote for abandonment or <br /> removal of existing SAS. specify Pump. <br /> Mr. Ball rade a motion to approved the following Title V design plan <br /> variance request as follows as remised on March 511", 2003: setback to <br /> street-side property line will be one foot. Bottom of SAS to estimated <br /> seasonal high groundwater elevation, four feet provided ' required). The <br /> use of the IIA system allows for three feet to groundwater as a remedial <br /> approved usage. This motion to approve the Title V design plan includes <br /> the following conditions: Health Agent shall witness a soil evaluation and <br /> bottom of the hole SAS prior to installation. An o & M agreement shall be <br /> provide to the board of health prior to occupancy of the dwelling. The o <br /> M shall include analysis for total nitrogen on a quarterly basis for the first <br /> two years of operation. Mr. Santos seconded the motion. Motion passed. <br /> T. Variance Request - 39 Fox dill Road: <br /> Mr. Christopher costa of ehistopher costa & Associates, Inc,, had <br /> submitted a letter dated February ', 2003, requesting the board's <br /> approval for the following variances: A local variance from setback of <br /> SAS to potable well of 1351, Use of singulair Bio-Kinetic Wastewater <br /> Treatment Model 960 as piloting approval, Mr. costa was not present on <br /> behalf of the applicant for this address. Mr. Harrington presented the <br /> letter to the board with no further recommendations as this was a <br /> straightforward variance request and a change of innovative alternative <br /> systems that had previously been approved by the board at an earlier <br /> date. <br /> Mr, Ball made a emotion to approve the variance requested of 151 from the <br /> SAS to the potable well. He also matte a motion to approve the use of a <br /> singulair Bio-Kinetic Wastewater Treatment Model 960 as Piloting <br />