Laserfiche WebLink
" 5 <br /> Y A <br /> i <br /> i <br /> thought that if it was a matter of throwing some PVC together, He could <br /> have Ms. Warden carry the PVC around for him. <br /> Ms. Warden added that Mr. Harrington was teaching her. she has been <br /> working out with weights in anticipation of this project. <br /> i <br /> Mr. Ball added that he had a lot of it at his house that was brand new, <br /> Mr, Harrington stated that it was all sic inch PVC pipe. <br /> Mr. Ball responded that he only had four inch Plc pipe. <br /> Ms. Grady asked why the report was dated in-February when it was <br /> = supposed to be quarterly. <br /> Mr, Harrington responded that .January, February and March mete up the <br /> first quarter and April begins the second quarter. <br /> Ms. Grady continued by stating that it seemed like it was two months <br /> apart and thea it would take six months or something. <br /> Mr. Santos asked if it was done in March; <br /> IVIs. Grady responded that it was done in February. <br /> Ms. Warden interjected that Woodard & Curran were sloppy. They didn't <br /> send us the first set. They seat the board two sets of reports at once <br /> because they hadn't sent the first one on time. <br /> Mr. Harrington asked what the date was for the monitoring information. <br /> Ms. Grady re-iterated that the report shows that the landfill gas <br /> monitoring results were dated February 4 th0 20031D <br /> IVIS. Warden countered by stating that she had read a letter from them that <br /> stated than they had not prepared it in a timely manner and was sorry for <br /> not having done so. <br /> Mr. Harrington concurred that it was dated February '', 2003. He <br /> continued by stating that they could certainly ask them to stretch it out. <br /> ICAs. Grady felt that that would be appropriate. <br /> Mr. Harrington added that he didn't think that the DEP ultimately cared a <br /> long they were done within each quarter, <br /> Y <br />--k <br />