Laserfiche WebLink
r <br /> • <br /> basin. He tried to allude to it. But, he couldn't address that. <br /> Mrs Ball asked who took care of the storm basins. DPW <br /> Mr. Harrington confirmed that it was the DPW that took care of the storm <br /> basins if they were-town roads anyway. <br /> Mr. Sanicki thought that it was the responsibility of the Popponesset <br /> Association. <br /> IVIS. Lewis continued by stating that she was concerned with a leaching <br /> field that takes on that amount of grater and what it means from a health <br /> perspective. Her other concern was that however this is constructed or <br /> the build up is completed. she doesn't want it to adversely affect her <br /> property. she felt that that was a reasonable concern. <br /> Mr. Sanicki asked if he could answer her concerns. He began by stating <br /> that from a health standpoint. He was following all of the state guidelines <br /> for designing a septic system. <br /> Ms, Lewis interjected that she was sure that he was doing that. <br /> Mr. Sanicki was trying to keep everything as low as he could. His problem <br /> was that the physical groundwater was mandating him to lift and build up <br /> this background. He didn't want to do that. This board has the right to <br /> adjust this variance by one foot. If they don't he would have to raise this <br /> system entirely another foot higher, He was trying to use a shallower <br /> design to the system for design purposes to not impact a large area of <br /> this backyard. <br /> Mr. Ball asked if he raised that up two feet he would impact her lot. <br /> Mr. Sanicki confirmed that that was correct and they would be above her. <br /> He would have to put in a wall, a containment structure and everything <br /> else. <br /> Mr. Ball referred to the engineer's plan and stated that Mr. Sanicki was <br /> impacting Mr. Adams' lot but he was putting in a containment barrier. He <br /> asked if sic inch was enough. <br /> Mr. Sanicki replied that that was just for surface run-off. There was no <br /> need for this for the design of the system. He meets the breakout with <br /> this fill as proposed on the plan. This was going to stay natural as the lover <br /> area that it is no ir* <br />