My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/24/2003 BOARD OF HEALTH Minutes
>
7/24/2003 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:46:28 PM
Creation date
3/26/2018 1:58:55 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
07/24/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Mr. Santos asked if they were the same flows. <br /> Mr. Tim Santos responded that they were all different flows, some <br /> residential and some commercial. They range from 330 CPD up to 1550 or <br /> 1580 GPD. <br /> Mr. Bail asked if there were any test results on them. <br /> Mr, Tim Santos responded that only one of them had been installed. <br /> Mr. Harrington stated that it was too early to fell. <br /> Mr. Boyd interjected that they had four at Otis. Basically they did a lot of <br /> testing this winter when most of the other systems were shut due to the <br /> cold weather, <br /> Mr. Bail asked Mr. Harrington if he had any ether comments, <br /> Mr. Harrington responded that technically he didn't have any other <br /> comments, But, overall in the project he was wondering with the other <br /> buildings that are left out and not getting systems. Their flows must b <br /> under 600 CPD, He would like to request a letter from Mr. Haj'Jar shoring <br /> the flows from those building. He wanted to known what's existing in the <br /> building and why he wasn't connecting them to the new systems. <br /> Ultimately he was restricting himself by keeping those buildings at less <br /> than 600 CPD. If he wanted to change out the usage of the buildings and <br /> he went over 600 CPD. He would have to upgrade those buildings. H <br /> needed to have it documented as to what was currently in the buildings. <br /> .lust because the age of Deer Crossing and how things where installed out <br /> there. <br /> Mr. Tire Santos confirmed that they could accomplish that task. <br /> Mr. Clean Santos added that this was going to take at least three months <br /> to accomplish this task. That was if they were lucky and everything goes <br /> smoothly. <br /> Mr. Tim Santos agreed with Mr, Santos and noted that all of the other <br /> installations had no problems with the process. <br /> Mr, Glenn Santos continued by stating that they would be corning back in <br /> front of the board with the a clear sailing some time in November. <br /> Mr, Tian Santos replied that once Mr, Harrington issued a letter the next <br /> day... <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.