Laserfiche WebLink
1 ry <br /> Mr. Glean Santos interrupted Mrs Santos and stated that the agreement <br /> they had with Mr. Hajjar was that the system would be installed and <br /> running by the end of the year. Everything. They had dragged this on long <br /> enough. He was net going to sit here and beat a dead horse again and he <br /> didn't grant therm to take him the wrong ways But, at the last <br /> meeti g...no r here we are again at the eleventh hour with a whole new <br /> proposal with something else. They started a precedent with commercial <br /> properties by giving extensions and being lenient. The board has always <br /> worked with people. It seemed like every time they got to the eleventh <br /> hour or a deadline there was a new proposal. Now they had this now <br /> system and his concern was that it was going to take three months to get <br /> ars okay. Would it still be done by the end of the year? That was the <br /> bottom line as far as he was concerned. December 31't, 2003, should b <br /> the date that it was all signed off as far as he was concerned. <br /> Mr. Haj jar interjected that he felt that in his opinion Mr. Santos was being <br /> a little tough on them. He gage a check to Dave Sanicki to start the <br /> process. A check for $14,000.00 with some work done and a return of <br /> $4,000.00 to $5,000.00. That money doesn't get applied to this job. Then <br /> the torn planner was the one that recommended he speak with Mashpee <br /> Commons. It would be much better for him and for the towFn. He had <br /> already given his check and spent his money with the other guy. He was <br /> thea sent down another path at the request of Mr. Fudala, Otherwise he <br /> would have gone and finished and been dome with it. He never dragged his <br /> heels on this matter and that was what Mr. Santos was making it sound <br /> like. He newer had. He went down two separate paths because of the town <br /> planner. He then met with these gentlemen and his understanding was <br /> that their results were much better than the other systems. Maybe in the <br /> encs it was going to be good. He had already spent some of his money with <br /> them too. He had been right there. He has spent a lot of his time coming <br /> down here and a lot of money with checks. He was not dragging his heels. <br /> Mr. Harrington added that the board was also going to give cape & Islands <br /> the spring and the summer to do the surveying and submit the plans, H <br /> had approvable plans, granted he hadn't reviewed therm all fully <br /> technically. They did just get them a couple of days ago. But, ultimately <br /> they had approvable plans in their hands. They were going to give cape <br /> Islands the entire summer to get plans to the board to do their surveying. <br /> As far as he was concerned they were ahead of the game right now <br /> because they had plans in hand. <br /> Mr. Ball asked how they could speed this up. <br /> Mr. Tire Santos suggested that if he received a letter next week. He would <br /> 6 <br />