Laserfiche WebLink
spoken to other engineers who liked the subsurface drainage system. <br /> Their reason was that In the winter the ground was frozen and there <br /> would be no leaching, It would probably overflow and create other <br /> problems. Mr. Santos asked if they just had to approve the preliminary <br /> plan. <br /> Ids, Warden added that with that carne the ZBA request for comments, <br /> They would want to make any comments to them as well. <br /> Mr. Santos asked where the drainage was for the Atte 130 area. <br /> Mr. Harrington pointed out that the legend referred to if as storm water <br /> management. They didn't show what the structures are there, But, they <br /> could at least make a comment-that the storm water management areas <br /> must include subsurface structures. <br /> Mr. Santos wanted deep hooded basins for oil and wafer separation, This <br /> water could not go out into lite 130. They had to catch their own water. <br /> That was just basic state highway regulations, That was his major <br /> concern to begin with, as they did not meet the Bbl's requirements, <br /> Ir. Harrington stated that this plan was just the plan for the property and <br /> road plan so that they could show their line of sites. The details,) the road <br /> and catch basins will come in later plans,, However, they could at least <br /> tell thein what they wanted for the storm water management areas. <br /> Ms. Grady asked if they were going to be meeting with the developer. <br /> Mr. Harrington stated that Ms. Warden had met with thein before. <br /> . Grady asked if they would be able to give there the board's comments. <br /> Mr. Harrington stated that they would provide the ZBA and the planning <br /> board with their comments, <br /> Mr. Santos made a motion to approve the preliminary plans for Southside <br /> Fealty Trust L.ettie Lane) with the condition that the proposed plan <br /> shows drainage construction with subsurface drainage, Ms. Grady <br /> seconded the motion. Motion passed. <br /> APPOINTMENT: Ce Veronica Zvlinski -Title V Violations <br /> Ms. Carron noted that all of the appointments on the agenda today had ` <br /> mail posted at the sane time. The cards came back on the M.ashpe mail <br /> but the not on the Falmouth mall. <br /> Mr. Santos felt that this was the third time she was supposed to be <br /> 7 <br />