Laserfiche WebLink
w <br /> passed. <br /> APPOINTMENT: carmen Shay- 1 1 Childs toad <br /> Mr, Shay was present from Shay,Environmental services. He was <br /> representing the owner of Childs Toad for a septic system repair. It was a <br /> really tight lot,, The one thing that had changed from the request letter <br /> was that they were not asking for a reduction from five feet to four feet to <br /> groundwater. He went over this with Mr. Harrington, They apparently have <br /> some monitoring well information for that area relative to where <br /> groundwater truly lies. Mr. Harrington had hires change the Plan so that <br /> everything wars NGVD. The groundwater had been designated as elevation <br /> 1.1 per the capacity in that area. Using elevation 1.1 they Put the bottom <br /> of the system at 6.1 to give there the five feet. They really needed a two- <br /> feet profile system in dealing with such a small lot. The rest of the <br /> variances were as follows: reduce the separation of the leaching to the <br /> foundation. He wouldn't call it a crawl space, but it was some cement <br /> blocks the house was sitting on, It was barely even a foundation. They did <br /> provide for a vinyl lining to be set to the elevation below the existing <br /> bottom of the neve septic system. This was done for two masons. The first <br /> was because they were asking for a reduction from 201 to 12.51 to the <br /> foundation to the leaching. The second wasi that they needed to squeeze <br /> the septic tank in there. They were going to reduce it to six feet to the <br /> foundation. The liner should basically go all around the L-shaped area and <br /> beyond to the property edges so that they could have the maximum <br /> amount of protection. <br /> Ms. Warden asked on that point what type of variance did he want from <br /> the tank to the foundation to 1.6 feet. <br /> Mr. shay responded that he moved the tank for the reprised plan because <br /> the contractor said that he did not want take the chance with the original <br /> plan that had it snugged right over to the corner. The contractor was <br /> uncomfortable with it being so close to the foundation. <br /> Ms. Warden asked if he was looking for a four- foot variance. <br /> Mr. shay confirmed that it would be four-foot and six-feet total. He was <br /> going to taut the tank five-feet from the lot line, which was kind of the <br /> minimum with lot lines without it becoming sticky, Those were mainly the <br /> variances the tank, fire-feet from lot 656 and the SAS was five-feet from <br /> the two lots behind, 670 and Egg, and six and one half feet from lot 663. It <br /> was just a squeeze. He tried to split the difference the best he could. <br /> Mr. Ball asked about some other lots on the plan. <br /> 3 <br />