Laserfiche WebLink
C � f <br /> { <br /> 3 <br /> Mr. Harrington began by stating that this was a commercial property that <br /> they had already reviewed, The request was 24 bays at 15 GPD per <br /> employee with a 300 GPD design flog. This was basically an industrial <br /> zone, He assumed that these were going to be contractor's bays. He had <br /> not seen anything from the ZBA as tar as what there restrictions were for <br /> the property. They have on ether commercial properties restricted <br /> potentially hazardous materials, no repair or service to be done on public <br /> vehicles and any changes to tenancy and/or had to be approved by the <br /> board of health. That way if any of the individual bays undergo af change of <br /> use that goes beyond the Title V use. They would have to obtain board <br /> approval. <br /> Vis. Grady stated that one of the bays was Maffei Landscape construction. <br /> Right? <br /> Mr. Santos stated that he had already built his own. <br /> Ms. Grady asked if he would be keeping fertilizer and stuff in that location. <br /> Mr, Harrington stated that they had a restriction on that bay, <br /> Ms. Grady asked if they knew that. <br /> Mr, Harrington stated that they did know that that was the restriction. If <br /> they wanted more than that they would have to request a variance from <br /> the board's decision or appeal the board's decision. He sends a written <br /> letter on the board's decision, He sant a written letter back to cape <br /> Islands because they were the ones who did the request. He copied <br /> Maffei. They were made aware of all of the board's the decision because <br /> they only have a certain period of time that they could appeal the board's <br /> decisions. The additional changes for the plan. The soils to be verified at <br /> the time of installation because the test holes were done up front and the <br /> leaching is going in the back. carbon filter to be provided on the vent, <br /> This property was not in Zone II# His question was why they did not build <br /> up this property up to 599 GPD, which was just blow the 600 GPD <br /> regulation? if somebody wanted to put in some other uses, they could <br /> have provided for this ahead of time. It was going to be in a gravel area <br /> and why not plan for it ahead of time. Furthermore, they did not spec any <br /> office space* Usually within these contractors bays they usually have <br /> some small office set aside. <br /> Mr. Ball felt that this plan was somewhat incomplete. <br /> Mr. Harrington had his comments that he had not gotten back to him on it. <br /> But, he felt that they could address all at one time. <br /> 3 <br />