Laserfiche WebLink
y <br /> 5 <br /> Mr. Ball agreed with is concerns, But, he could Hulce a decision to <br /> continue it until they concerns were answered. <br /> Mr. Santos had one question. Had they seen preliminary construction for <br /> this piece of property? Where were the drainage swales and catch basins? <br /> They usually see that preliminary plan. Thea they cone through with the <br /> actual wilding design and the septic system for approval. <br /> Mr, Harrington stated that the road drainage had already been noted on <br /> the subdivision plan that had been approved. But, the individual properties <br /> have the bio-retention drainage svwr les that are noted with the swiggly <br /> lines along the edge of the parsing areas. <br /> Mr. Ball thought that they had already approved this plan. <br /> Ir. Harrington agreed that they had approved the plan for the street but <br /> not for the individual properties. <br /> Mr. Santos stated that they had requested this with otherproperties. He <br /> did net want to see retention ponds. He wanted to see sub-surface <br /> drainage structures in the swales. He had no problems with the,swales. <br /> But, right now it looked like the water runoff was going out towards the <br /> property lines,, His concern was the lack of elevations. How deep were <br /> they going to be were they going to be a little shallow depression where <br /> it didn't even meet the twenty-five year flood plane? <br /> Mr, Harrington interjected that this was way up and wouldn't be near any <br /> flood plane. <br /> IIIb. Santos wanted to Know if Mr. Harrington understood his position. <br /> Their water couldn't be running over to the neighbor's property. <br /> IIIb. Ball asked if they didn't have some type of requirements for catch <br /> basins. <br /> Mr. Santos wanted to see horny they were going to maintain this area. You <br /> had a commercial building with cars leaking oil, anti-freeze and <br /> everything, You needed-have some means of a solid structure for <br /> protection to the groundwater or an NDC trough, which was basically a <br /> deepwater catch basin. They it could be piped into the drainage swrale,, <br /> They want some type of a,,subsurface structure for when the ground was <br /> frozen in order to eliminate a mosquito hatchery. <br /> Mr. Ball made a motion to continue this agenda item until all questions <br /> were answered regarding their plans for this property. Mr. Santos <br /> 4 <br />