Laserfiche WebLink
4 <br /> APPOINTMENT: Jeff Ryther, BSS Design - La Plaza Del sol <br /> Mr, Fyther was present on behalf of the applicants for this address* <br /> Attorney l irrane was also present along with the Patel, owners. <br /> Mr. lyther began by stating that the last time they presented the project <br /> they were trying to get some guidance from the board. They were under <br /> the impression that the board would consider the plan that was in front of <br /> there. The office was once on itys own lot as a separate dwelling. He <br /> believed that Mr. Ball had said that since there was once a separate <br /> dwelling, which was four bedrooms plus a small office area, Perhaps the <br /> board would consider an update to the front yard rather than trying to <br /> bring wastewater around to a system that was only sized for the motel. so <br /> currently they had two cesspools here that were sandwiched between the <br /> swimming pool and the drainage easement. There was a drainage line in <br /> there from Main street. It just got paved with a catch basin. This would <br /> require turning the plumbing around and going into the front yard, The <br /> motel shows a retrofit into the existing Title 1 systern. By the way, both of <br /> these systems did pass a Title V inspection during the transfer, Those <br /> reports were in the file* This was ar unit 249 bio, iere with an 81 diameter <br /> cylinder. it was a modified trickling filter dentrifiation system with a <br /> fixed film aerobic process. This was the only s stem that would really fit <br /> into this area. Them were currently two large trees a beech and an oak <br /> tree, since they did have a parking pattern with the-exception of where <br /> those trees are, They plan to Mice array those trees and insert the unit in <br /> that location* They will intercept the piping over to the d-box through that <br /> unit with a re-circulating line back to the inlet enol of the tank,, That was <br /> the denitrification system. There were some variances requested in the <br /> comer letter and on the plan itself. To do this system in the front yard the <br /> grater service was less than 101 to the SAS, There was currently water <br /> service in the front yard. They would line to replace than service, sleeve it <br /> and leave it in this location. That would provide double protection there <br /> with the new lines. The next item was number two. A standard Title <br /> system from the water protection regulation rather than trying to denite <br /> this and this Mr. Ryther is now pointing to the plan itself.) on this lot. The <br /> next item addressed the regulation that asks for 10 milligrams a liter or <br /> less of total nitrogen. speaking to a manufacturer of this unit. He had <br /> spoken to the manufacturer of this unit who advised him that he could get <br /> this down to 12 to 15 milligrams per liter. It would certainly meet the DEP <br /> requirement of 19 milligrams per liter. <br /> Mr. Harrington interjected that 19 was residential and 25 was commercial. <br /> Mr. I yther thanked Mr, Harrington for the correction. He re-adjusted his <br /> calculations and stated that they could certainly meet that one. He did <br /> 1 <br />