Laserfiche WebLink
r <br /> i <br /> i 1 <br /> i <br /> for the pumps, It would last longer. <br /> Ms. Bogucki stated that it was 230 volts. But, he.didnPt put the <br /> horsepower on it. <br /> Mr. Harrington stated that once again he hadn't had time to check on <br /> because he had not dealt with the Holmer pumps* But, they were probably <br /> three or four horsepower pumps, They were probably good size pumps. <br /> They were larger than your half horsepower residential jobbers. They <br /> were going to be big pumps, which would take a lot to keep therm on. It <br /> was going to be a hell of a draw on power. The other comment was that <br /> the size of the area for the nitrogen loading calculations. It was a g. -acre <br /> site. <br /> Ms, Bogucki replied that if they were talking about Title V acres it was <br /> actually more than that The area that was included in the calculations <br /> did not include the road. <br /> Mr. Harrington added that that was the g.65 acres that was used in the <br /> table. <br /> Ms. Bog ucki concurred. <br /> Mr. Harrington asked if there was going to be any type of groundwater <br /> monitoring that was going to be done on the property. <br /> Ms. B gucl i repined that they did not have that because they were not <br /> going for the groundwater discharge permit. It would probably be an easy <br /> enough thing to add if the board required it. <br /> #r. Harrington stated that this property was over 600 GPD and the 600 <br /> GPD regulation required that a well down-gradient 101 from the property <br /> rine would be monitored quarterly for total nitrogen. They just went . <br /> through that with La Plaza Del Sol. They gave therm a variance from that <br /> because their system was already an the property line. He felt with the <br /> ruler nearby he thought that this was something they might grant to add <br /> in. Again, this was going to be under piloting approval through the state. <br /> They could recommend this to the state and have them add it if they <br /> would like to do that. Piloting was already a pretty rigorous process with <br /> long-team requirements. This was the first time that i itre c was going to <br /> be used on a larger system. We erre going to be guinea pigs here. He felt <br /> that it definitely behooved the board to cover all of their avenues <br /> especially on the monitoring with the distance to the river. <br /> Mr. Santos was in agreement with Mr. Harrington's position on this <br /> 1 <br /> k <br />