Laserfiche WebLink
� ■ <br /> 4 <br /> ti <br /> he had assumed, when he spoke with him today, that he was going to be extending <br /> the leaching facility out in the same direction across the driveway. He did not have <br /> this in front of him and didn't realize that there was enough room to even...He had <br /> been on the property and the property was fairly thick with treats. He hadn't realized <br /> that there was even enough room. He know knew why he also went to the bottom <br /> area because he had to use the sister data. It had essentially become a Meld. <br /> Mr. Grotzke stated that his assumption was correct. <br /> i <br /> Mr. Harrington noted that those were two items that made sense now that he saw <br /> them on the plan. He apologized again for his misunderstanding. <br /> Mr. Grotzke stated that it was difficult sometimes to understand verbally what they <br /> were trying to accomplish. <br /> Mr. Harrington added that he was forewarned that it corning in enough time to put it <br /> on the agenda. But, again it was... <br /> (Ms warden is speaking but I cannot hear what she i.s saying., . <br /> Mr. trot ke answered Ms. warden and stated that the information was the previous <br /> system that was just installed earlier this year. It was installed and based on an old <br /> pereulation test. what they were doing was just augmenting the existing system with <br /> two additional flow-diffusers at exactly the same elevation and the sane location. <br /> Mr. Harrington added that Cape & Islands did the design for the repair of the <br /> system. It had been done just recently in June. It was-a three-bedroom flow diffuser <br /> system that was in there. <br /> Mr. tarot ke wanted to add some brief comments that was notable about the system <br /> was that the existing system was located 101' from the wetlands/salt marsh and ' <br /> from the top of the coastal bank. with the expansion they would be maintaining the <br /> exact same setbacks so that they were no closer to the resource areas. They were <br /> going to re-locate the existing pump chamber that was there. They were abandoning <br /> the 1000-gallon septic tank and proposing to install a denitrification system. Again <br /> they did the denitrification calculations if they were interested in seeing them. <br /> Mr. Harrington stated that the board had done less than 100 feet from the top of the <br /> coastal bank. The board had required the LTA system on Great Oak Toad. <br /> Mr. tarot ke stated they would be happy and willing to install it. But, they felt again <br /> since they were maintaining the existing setbacks and adding the denitrification with <br /> an effluent quality that would be rather high. That the duality would be far superior <br /> than they had now. <br /> Mr. Ball stated that he wasn't feeling to comfortable with this request right now. He <br /> 10 <br />