Laserfiche WebLink
He responded that he was not here for the meeting. <br /> Ms. warden stated that she had one small-thing to add to the plan. He did not have <br /> anything about the Board of Health coming in to do the final inspection just,for the <br /> contractor's purpose. <br /> Mr. Shay assumed that that was part of the protocol anyways. Here was what they <br /> re actually proposing was that depending on how the construction goes here, they <br /> may have to do this in stages by putting a part ofthe field in so that they wouldn't <br /> have to keep collapsing a whole bunch of material. They didn't want to undermine <br /> any foundation. They would have to work on ten-feet. Have it inspected fill it and <br /> run more pipe, put more stone down. Inspect it. They may have to do this in to or <br /> three inspections, which was clue to the constraints of the lot. So he had already <br /> talked to Mr. Bane about that.point. <br /> Mr. Ball asked about the lining. <br /> Ir. Shay stated that it would be all the way around the system. The tank also was <br /> going to have a40-mil liner all around as a safety in the event that it cracked. It was <br /> an H2O tank just in the event that somebody could squeeze a vehicle back there and <br /> clave on it. Also,just in the event that it was a low lying area and if there ever was <br /> groundwater issue. It would be heavy enough not to float. <br /> IVIS. warden asked if it was going to be plastic. <br /> Mr. Shay stated that it was H2O cement. It weighed about 28,000 lbs. The tank <br /> would go in first. They were going to plumb the outside shower to the tank. <br /> IIs. warden asked about the drainpipes. <br /> Mr. Shay stated that they would have to put a down spout drain in the back. They <br /> could put a little drywell and run them out t the backyard. <br /> Ms. warden asked if they would be doing all oftherm. <br /> Mr. Shay stated that they could pitch them to the back with the downspouts coming <br /> down and be tied to an underground to a regular dry well, which wouldn't impact the <br /> septic system. They would recharge the groundwater for there. <br /> Ms. warden stated that they were doing the best they could. <br /> Mr. Shay stated that Ms, warden had mentioned that it Haight have been why the <br /> other system had failed. <br /> Ms. warden stated that that was a guess. She was sure it contributed to the failure. <br /> 15 <br />