My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/17/2005 BOARD OF HEALTH Minutes
>
02/17/2005 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:20:48 PM
Creation date
3/26/2018 2:51:17 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
02/17/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Horsely added that Con Comm was very happy with this plan. They were in the <br /> final stages with-them tweaking the design. <br /> Mr. Harr*ngton stated that there were other catch basins here. There was only the <br /> other roof dryells. So everything was overland lo . There was no...but the under <br /> dra.ln met the board's criteria. <br /> Mr. Santos stated that that was their sticking point. <br /> Mr. Harrington stated Haat the four-bay where they were going to having t di g <br /> grater was a sticking point with them. <br /> Mr. Santos felt that they could still follow best management practices because they <br /> were going to have the vegetation and water going over that area. They just didn't <br /> want the major pooling. They had probably been around stagnant ponds. <br /> Mr. Henderson stated that they were mosquito breeding rounds. That their stormy <br /> water guy's biggest concern was the mosquitoes. <br /> Mr. Santos stated that they could still accomplish everything and not have the <br /> ponding by having the water run through that system. <br /> Mr. Henderson pointed out the wastewater system. The site was located in the <br /> groundwater protection district. Here was the proposed building. It was to-floors <br /> with 3481 square feet. They calculated a design flow of 523 CPD. That was Just <br /> based on office use. They were proposing a lo-gallon septic tank with a bull run <br /> valve installed at the board's request. They had two d-boxes so that both systems <br /> could be switched back and forth alternating what to do. <br /> Ms. 'warden asked if this would be paved. <br /> Mr. Henderson stated that it would be paved. They were proposing a vented system <br /> with carbon filters. Groundwater was passed on the frimptered test pits that were <br /> performed back in 2001. It was all sandy material. Their groundwater elevation was <br /> 28.2. They were maintaining five-feet above groundwater so that the whole system <br /> was going to gravity. <br /> Mr. Harrington had a question on the building. was that going to be two floors <br /> above grade or was the basement going to be finished They were showing a full <br /> foundation in the basement. <br /> Mr. Horsely stated that the basement was going to be finished. <br /> Mr. Harrington stated that it was going to be a one-stoat when they looked at it from <br /> the road. it was not going to be two full stories above. As far as the overall <br /> calculation arra the square footage. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.