My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/17/2005 BOARD OF HEALTH Minutes
>
02/17/2005 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:20:48 PM
Creation date
3/26/2018 2:51:17 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
02/17/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Brady added that he specifically stated that the valve was replaced at that time <br /> because it was not working. <br /> Mr. Ball stated that that was January f 2002. <br /> Mr. Brady confirmed that that was correct. He added that the two pits were dry 1t <br /> said that in the report. <br /> Mr. Harrington stated that the flow selector was repaired. Correct. <br /> Mr. Ball stated that the systems were re-inspected after the repair. <br /> Mr. Brady stated that that was correct. <br /> Mr. Ball stated that that was this report in front of them. Could they go by this <br /> report? <br /> Ir. Harrington stated that they did not know what they actually said about pits three <br /> and four. If the selector valve was switched over to pits one and two the s stern <br /> would have been operating and the other pits may have dropped. He didn't know <br /> because there was no description on the leaching pits there. <br /> Mr.McGrath stated that he had uncovered the three active pits today in A and B. He <br /> apologized and stated that he did not do it himself personally. one of his employees <br /> did it. Building A has two pits that they call One and Two. They turned the valve <br /> and now they were going to flow into Three and Four. Three and Four were empty. <br /> One and Two had 11'9" of empty face. Building D had 4'3" of void and the other pit <br /> was empty. They turned the valve to the empty pit. So right now they Were dosing to <br /> three empty pits. <br /> Mr. Santos asked Mr. McGrath if he knew the last time they were pumped. <br /> Mr. McGrath stated that he did not know that information. <br /> Mr. Ball stated that basically they did an inspection and the pits were not 1n failure. <br /> Was that what he was saying? <br /> Mr. McGrath stated.that the board asked him to look at the pits and they were not in <br /> failure. <br /> Mr. Ball replied that they could go by that. He was a licensed engineer. They asked <br /> him to look at the pits. <br /> Mr. Harrington stated that they did not ask hire to look at the pits. They asked him to <br /> do an inspection and if he wanted to do an inspection report with the information in <br /> writing. That would be fine. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.