Laserfiche WebLink
x F - <br /> I <br /> I <br /> Glen`Harrington commented that the septic plan prepared for replacement of a 30-plus year old <br /> septic tank, a leach pit that is located partially off the property and a graywater cesspool. <br /> Glen recommended that Mr. McEntee provide a cleanout at the house on the line that goes from <br /> the graywater cesspool to the septic tank, which will make it easier to snake from the outside <br /> down to the septic tank in the event that it clogs. <br /> Kalliope Egloff made a notion that the Board approve the above three variance requests as <br /> presented by Peter McEntee for 154 Fells Pond Road with the condition that the plan include a <br /> cleanout at the house on the line that goes,from the graywater cesspool to the septic tank. <br /> Burton Caplan seconded the motion. The motion was unanimously approved. <br /> 8:00 PM— Matthew Eddy, Baxter Nye Engineering —Commercial site Plan -64 Industrial <br /> Drive <br /> Stephen Matson, PE with Baxter Nye Engineering, introduced himself to the Board. <br /> Glen Harrington gave background information on the Commercial site Plan for 64 Industrial <br /> Drive, stating that the septic and site plan was originally approved by the BOH on 2113108. The R <br /> site plan and building design have undergone many changes,-and therefore a new site plan has <br /> been submitted by the applicant and engineer for BOH approval. The septic permit approval is <br /> still valid as the approval occurred during the tolling period of the Permit Extension Act (1101108 <br /> to 1/01110). The extension allows the permit to be good for two additional years unti12013. The <br /> septic plan that wag originally approved and prepared by Cape & Islands Engineering is still the <br /> septic plan of record. The site plan charges include drainage, irrigation well, parking, floor plan, <br /> and uses of the building. Glen stated that any changes in use of the property are required to go <br /> through the site Plan Review process. Glen Harrington added that all the bays have <br /> bathrooms. <br /> Burton Caplan aide a motion that the Board approve the construction permit submitted on <br /> behalf of 64 Industrial Drive, with the stipulation that Cape,& islands Engineering recertify the <br /> installation along with all the existing approved criteria from the approval letter dated 2129108. <br /> Kalliope Egloff seconded the motion. The motion was unanimously approved. <br /> EW BUSINESS <br /> 1. Sign Warrant <br /> Board members signed the warrant. <br /> 2. Review and Approve Public session Minutes: X125111 and .lune 22/11 <br /> Kalliope Egloff made a motion that thia Board approve the previously amended Burd of Health <br /> Public Session minutes of 5125122. Burton Kaplan seconded the motion. The motion was <br /> unanimously approved. <br /> The Board members made amendments to the 6122/11 BOH Public Session minutes. <br /> Kalliope Egloff made a motion that the Burd approve the amended minutes of the 6122/11 <br /> Board of Health Public Session. Burton Kaplan seconded the motion. The motion was <br /> unanimously approved. <br /> . Request et for septic Inspection variance: 112 Waterline Drive south <br /> Patty Connolly, of Beal Estate Associates, introduced herself as representing Keith and <br /> Laurinda Grabow, owners of the property at 112Waterline Drive South. Ms. Connelly stated <br />