Laserfiche WebLink
t <br /> The Board members amended the minutes of the.Public Session meeti ng of 0 1/11/12. <br /> Kalliope Egloff made a notion to approve the amended January 11, 2012, minutes. Burton Marplan <br /> seconded the motion. The motion was unanimously approved. <br /> . Title V Variances for Septic Upgrade: 52 Uncle Henry's Road — Gary Eynatian. <br /> Gary Eynatian, property owner: introduced himself to the Board. <br /> Mr. Eynatian stated that his septic system failed upon a septic inspection. The property is in a high <br /> water table area, and the lot size is limited. Mr. Eynatian is requesting a couple of variances to <br /> upgrade the system. <br /> Glen Harrington stated that the existing septic system failed inspection due to the lack of the required <br /> four feet from the bottom of the SAB to groundwater. The property is up for sale. The variances <br /> requested are a setback to the slab foundation and a one-foot drop to groundwater for the SAS. Title <br /> allowthe'variances per Maximum Feasible Compliance. Glen Harrington believes groundwater is <br /> near maximum. <br /> Burton Kaplan made a motion that the Burd approve the 2 variances requested for 52 Uncle Henry's <br /> Road as detailed on the plan provided. Kalliope Egloff seconded the motion. The motion was <br /> unanimously approved. <br /> 4. Request 2012 Petah Food,License and Tobacco License:, South carpe Wine Spirits. <br /> All licenses and permits are in order. Detail license is incidental to the primary business, and they <br /> have a liquor sales permit. <br /> Burton Kaplan made a motion that the Board approve the application for Tobacco and Food Sales <br /> permit submitted by South cape Wine and Spirits for 19 Commercial Street, Unit c-1. Calliope Egloff.- <br /> seconded the motion. The motion was unanimously approved. <br /> . 6 Dean's Hollow Fuad <br /> Glen Harrington asked to add 6 Dean's Hollow Road to the agenda. It was unintentionally <br /> overlooked. Deans Hollow was discussed at the last meeting.. <br /> Lucy Burton made a.motion to add 6 Dean's Hollow Road to the agenda. Kalliope Egloff seconded <br /> the motion. The motion was. unanimously approved. <br /> Glen Harrington stated that the buyer's attorney explained that the dwelling will not be razed but a <br /> second story is planned. cape & Islands Engineering was hired to design the system. <br /> The new draft of the enforceable agreement was provided. The criteria in the new draft is that the <br /> septic system will be constructed by June 30, 2012, and that no occupancy will take place until the <br /> neer system is completed. <br /> Glen Harrington requested setting a date to receive the fully executed enforceable agreement and <br /> also a date whereby Mr. Power is truly contracted with cape and Islands Engineering. Burton Caplan <br /> could like the Enforceable Agreement before February 8, 2012. <br /> The fully executed Enforceable Agreement must be submitted by February 1, 2012. Engineering <br /> must be received 45 days from closing, which would be' around March 8, 2012. By Jure 3 , 2012, the <br /> system must be installed with the contingency that there be no occupancy until the system i <br /> complete. Evidence of fecal compliance is the contract of the design system. <br /> 3 <br />