Laserfiche WebLink
i <br /> Iasi a WakeLake Minagethen <br /> CoMmilt'e''e. <br /> , P'H' -2009 <br /> 'x:30.. .M- <br /> Meetmin rr ! by,-, William Taylor <br /> T PL Yf ee 1' g: Monthly <br /> ,Sec r et rBarbara B. Nichols <br /> Att hMembers: William Taylor, Hans Fritschi,Barbara Nichols, <br /> Guests: Edward Baker, <br /> The minutes of the February 24, 2009 meeting were accepted as written. <br /> Agenda ics <br /> [Agendfip� 11 Lake l vel River,el -out - <br /> Discussion: The two lake level measurements forp ril were 55.7 and 55.6 ft. above sea level with 10 <br /> inches of water flowing over the boards at both times. <br /> Ed Baker mentioned.that the Herring Warden's budget is now used under Conservation, so that soon <br /> Drew McManus will also be the Herring Warden. <br /> Barbara men1doned that sand, which needs to be removed, had built�ip near the darn area. Also, <br /> overhanging branches along the river are catching debris. Amen'Corps members walked the river a few <br /> years ago and helped clean up. Members felt we should contact Perry Ellis to see if he would ask <br /> -DPW or Conservation for help to clean up the river. <br /> 4 <br /> Conclusions: Barbara will email Perry Ellis about gemming help to remove hanging branches over the river. <br /> [Ag�iida topic 2]: Tlftr <br /> Discussion; After-the additions of the lake level chart and updates on the Maass tournaments,Barbara <br /> emailed a,copy of the Spring Newsletter to Joyce Mason n for her approval. On April 14 th,newsletters were <br /> nailed. Four were returned for owner/address corrections. Joyce sent the pdf. copy to IT, and it is now <br /> Posted on the A 1 C web page. Barbara react a letter of appreciation emailed by Marc Elesoff,who is <br /> on our nailing list. <br /> Conclusions: Spring newsletters have been nailed. <br /> i <br />