My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/28/2010 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
>
9/28/2010 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 5:15:40 PM
Creation date
4/9/2018 2:44:22 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/28/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee ,- Waked <br /> Lake Managemen <br /> Committee <br /> September 2 ,2010 <br /> 7:30 PM <br /> Mashpee Town Hall <br /> r <br /> Meeting called William Ma.rsters <br /> Type f meeting: Monthl <br /> Secretary Barbara B. Nichols <br /> Attendees: Members: William Marsters, William Taylor, Barbara Nichols <br /> Mike Richardson,Liaison <br /> The minutes of the August 2 , 20 f meeting were accepted as <br /> � } written,.after a motion by Bill Taylor and <br /> second by William 1 arsters} <br /> Agenda <br /> [. R9 . <br /> ena topic 1] Lake level <br /> Discussion; The lake measurements in September were 55.5 and 55.55 ft. above sea level with 8.25 and <br /> . 5 inches of water flo�r�g over the boards. Bill Mar tears mentioned that large rocks had fallen e off the <br /> into the sluiceway} It was suggested we ask DPW to remove' there when they clean out ekeess sand in <br /> the sprig. <br /> Barbara met with Drew McManus in Conservation September 28h and showed hien the US Geological <br /> Survey naps of 1975 which listed Ma hpee and wal eby Ponds at'55 ft. above sea level, and also the <br /> graph showing water levels in the ponds since 2004 showing the winter spikes of lake level due to <br /> increased precipitation} She requested that boards be removed to lower the lake level after the herring fry <br /> had finished their exodus from the lake,e, which Perry Ellis previously stated occurred m late October} Mr. <br /> McManus agreed to this. The discussion continued as to the time of the Jast Mate inspection of the darn <br /> area, which had been done within the year. The State felt the structure was too small for the size of the <br /> lakes,but .McManus stated there were no ids to help rebuild it coir c l . <br /> Conclusions; The-late continues above the target level, and a half foot above the 1957 historic level. <br /> Conservation agreed to letter control water level during increased winter precipitation, and help prevent <br /> further erosion} <br />
The URL can be used to link to this page
Your browser does not support the video tag.