My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/26/2010 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
>
10/26/2010 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 5:02:07 PM
Creation date
4/9/2018 2:44:37 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/26/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Masi Wakeby Lake Management <br /> Commiffee <br /> October 2 , 2010 <br /> X7:30 PM <br /> MashRee Town itall <br /> Meeting called b : William Ma.rsters <br /> Type of meeting: Monthly <br /> S.ecretary Barbara B.Nichols- <br /> Attendees: <br /> ichols- <br /> tt ndas: Members. William Marsters, William Taylor, Barbara Nichols <br /> Guests: Edward Baker,Michael Richardson <br /> The minutes of the September 2 8, 20 10 meeting were accepted as written, after a notion by Bill Taylor <br /> and second by Bill larsters. <br /> Agenda topics <br /> TAgenda topic ll Lie jve <br /> Discussion: Barbara took lake measurements-on October 3rd and 15th. The water was at 55.56 and.55.64 <br /> i . above sea level with 9.75 and 10 inches of water gbing over the board..Ed Baker thinks the level <br /> are <br /> actually higher than the gauge measures and would like to ask Drew McManus to talo a measurement <br /> before; and then totally block the water flow and take another measurement after 3 o seconds. Barbara <br /> noted that she can see the water curve downward as it goes over the board by the <br /> gauge. <br /> Conclusions: The water level remains high as w o into the months of high precipitation. <br /> g g p�tat�on, <br /> [Agenda topic 2] PMI Te v letter <br /> +Discussion: The Fall Newsletter is now posted on the Town web site 1.3however the Spring piing one was <br /> removed and not archived. Joyce Mason said it v uld take too much space to archive,the older editions <br /> but did state that 2 editions could be kept. Barbara heid Kathleen een correct the link on our committee's web <br /> site to"Mashpee Wakeby Newsletter'"instead of lust" a.keb Newsletter."'Barbara took the.m <br /> ,� aster for <br /> to Joyce and.requested the 20 printed copies as promised earlier, but.ice said it could not be done as <br /> funds were prohibitive. Ed Baker stated that the newsletter could be copied at the UPS store for 16 cents <br /> each, if a$40 carol was purchased. would do about 250pga e newsletters mike Richardson offered to <br /> take the master to Joyce again and request the 20 copies promised in his last conversation with her about <br /> it. Barbara felt it was important to get out the information on water quality to folks around the lake,, <br /> - <br /> especially as the cranberry bog is flooded for picking, and water will soon be rebased back into the lake. <br /> Conclusions: Althoughthe link on our cosi <br /> tt page has been coffected,, theneslettr has not been <br /> printed. L <br />
The URL can be used to link to this page
Your browser does not support the video tag.