My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/27/2012 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
>
3/27/2012 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 5:06:29 PM
Creation date
4/9/2018 2:51:30 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
03/27/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Masi a —Waked Lake'Ma'' nagement <br /> Committee <br /> _ µ March 27,2012 <br /> n '7:30 PM <br /> :w {v <br /> MashPee Town <br /> Meeting called- : x George Bingharn III <br /> Type of meeting: Monthly <br /> Seeta �z Barbara B. Nichols <br /> Attendees: Members. William Taylor, Barbara Nichols,hols, o bi McManus, Andrew Gottlieb <br /> Guests: Mr. Mone, Harbormaster <br /> The minutes of the February 29, 2012 meeting were accepted as written after a motion by George and <br /> second by Bill Taylor. <br /> :Agenda -to <br /> ski <br /> fAgenda t' pic 11 Lake level :; ; <br /> Discussion: Barbara mord the fake <br /> at the outlet on March 2nd and 15th.The lake measured . and <br /> 55.5 ft. above seal level with 15 and 16.5 inches of water flowing over the board closest to the lake. <br /> There has been little precipitation this month. The measurements were emailed to Drew Manus in <br /> Conservation. <br /> DPW cleaned out the 5 inches of sand build—up in front of and behind the flshway, the second week in <br /> March. Drew also reported that on February 27th,Arn riCor s had completed the walk of the river, and <br /> cleared significant blockages to river flow. Overhead vegetation was left, as it provided good cover for <br /> migrating herring from predation. <br /> Conclusions; The lake level re-mains constant. Spring river maintenanee has been completed. <br /> Y, c 1 - ] �a `�'oumarn nts <br /> Discussion: The list of bass tournaments was again reviewed s 5 new ones had been added to the online <br /> site. It was noted that there were 3 Sat. or Sundays meets in August and only 2 are permitted according to <br /> regulations Witten in 2007. Mr. Mone stated he thought one of the tournaments had been cancelled, H <br /> ill check on this. Barbara read an email from Heidi in Recreations stating that parking fees at the ramp <br /> were allowed to increase to $7 for in state cars and out of State would remain the same. A question <br /> remained as to whether this fee was $10 or$15. <br /> Conclusions: Barbara will clarify the cost for an out of state vehicle to launch a boat with Heidi. <br />
The URL can be used to link to this page
Your browser does not support the video tag.