Laserfiche WebLink
Systems publication, noting the 'importance of creating a resource <br /> center Life Long Learning) , computer internet access technology <br /> area. <br /> There was discussion regarding opportunities of public <br /> sponsorship, and fee structure connected with outside use of the <br /> meeting room axed/or conference room spaces. <br /> There was also discussion regarding consideration of age <br /> appropriate spaces and interests; a larger, more comfortable <br /> periodical space; and ars overall attractive appearance of the <br /> building; the ability to self--navigate via directories/signage. <br /> (Member Grace Talmage left the Meeting at this point. ) <br /> Ed DeFoe reiterated changes, corrections made to the draft <br /> text were those of grammar, spelling, punctuation, and context <br /> phrasing. <br /> The Library Director questioned the build-out population <br /> figure of 20, 000, stating she would seek verification. Her <br /> concern being the project not be proposed based upon pear <br /> summer population approximately 8-weeks) , but rather spring and <br /> fall populations. She requested an opportunity to review this <br /> matter further. <br /> Ed DeFoe made reference to suggested changes on page - - <br /> "linear feet" to "per linear foot of stacked shelving" . He <br /> explained the architect had reviewed computations used to <br /> determine size of stacks, square footage, isle space/shared isle, <br /> as well as the proportionate pant of the shared isle. <br /> The Library Director explained the Building Code requires <br /> a 20-foot space between parallel stacks. <br /> The word "Dedicated" has been deleted from page <br /> Volunteers Room. <br /> . There was discussion regarding .incorporation of a <br /> shipping/receiving area; whether or not to eliminate tables, <br /> consideration of a different style of table (dual. use) . <br /> Change the word building "organization" t "design" . <br /> There was some discussion with regard to the Word <br /> "demolition" as used on page -10- . Ed DeFoe explained partial <br /> demolition will be necessary in order to add the new structure <br /> onto the existing building. Cost savings due to cooperation <br /> with Fields Point" has been added at the suggestion of Ed DeFoe. <br /> changes made to the Appendix-Rename "Children' s Art and <br /> Craft Room" . The Library Director suggested "Programming/Craft <br /> Room" for those occasions when the space is being used for adult <br /> - - <br /> k <br />