My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/27/2003 LIBRARY BUILDING COMMITTEE Minutes
>
5/27/2003 LIBRARY BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 5:10:24 PM
Creation date
4/9/2018 3:18:21 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
LIBRARY BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
05/27/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' TOWN OF MASHPEE <br /> LIBRARY BUILDING COMMITTEE <br /> Minutes from the Meeting of 5127/03 <br /> committee Attendees: Al <br /> so Attending: <br /> Kev'in Connolly <br /> Helene e <br /> - - - brace Talmage_-� .olr� ler - - - _ <br /> Maureen Rounds Buff Chace <br /> Ed DeFoe J. Stewart Roberts, Architect <br /> ` <br /> ct <br /> Fundal!.jmaf, Architect <br /> Chairman 1'evinonnolf o <br /> pened r l the meeting at' 1 g pll M. As there was n quorum res <br /> corr�rr�lttee dispensed with review and approval of the minutes � . n#, the <br /> 2125103. from the previous rretng held on <br /> . Stewart Robert's erta <br /> Ubdated Model.—el.—exterior. Mr. Roberts <br /> proceeded to review.the re�riedd. .icr�model for the <br /> new f f bury structure,.stating that the desi h i much the ' ' '-.�. ' ,, . <br /> meeting roam locations arne. � e'.cl��•ldrer� wing'and the been "flipped, or reversed, which fits the site of #� <br /> appropriately. ,The children'sstorycraft room area ! ' t structure more <br /> now ad to the planned. i#e for-future <br /> development f a �hi�drr�'s�f' fus �t�r�. 1`h rutin room . <br /> function, is..nov�r located on t � - , which will serve more as a civic . <br /> k e more public corner of the building. The yard to the rear is bin <br /> . . developed a a landscaped court and with fenced � . . . <br />- -- _ door for ant lr�tm'ee'tinga d rn yard for ch�fdren outdoor activities, end � - <br /> the -room for after hours, Landscapingand sculptures <br /> .k coy�tyard are pined for future development. for the-rear <br /> behind the co There will be a two- . wide dri�rerra <br /> urtyprd, which will connect to the Mashpee Common the # <br /> the children's re and the meeting mom hes be side appearance of <br /> en toned down and.works together more <br /> approprlat ly with':ifne m' ain.building. Lirnesto�ne idin and a <br /> with an etre toward low rair�tn g nate rood are included��the design <br /> ahce. Pricing alternates will be considered when selectin -sl <br /> - <br /> and f`r�-ntcna siding. The f�u!!d'rr�g will be steel frame �. g ate <br /> The dommitt e a reed th , with �af�on grade, and no basement. <br /> � at the revised exted6r plan i ver attractive and will corn � <br /> --exterior-of-the--adjacent-Chri t-th -1 ire _' fu-`d :� ...��--T�--- ---�-- - - nt,the-' <br /> trio —'tine reprised is much the same for both'the n mode! " �the first and- second + <br /> , floors. An <br /> atriumiplanned, opening to the second Boar. There is a c � ` <br /> an orlon for one on the first fuer as well. r ' pier area on the second floor, with <br /> . of�erts reiterated that to include+dans for a <br /> basement for future expansion was not cost effective. 1 <br /> the first Boor: will w![ be better to expand outward from <br /> Mr. fort stand that we would geed to tarn b <br /> lntedor design hese � p n a � t � month construction schedule. The <br /> g f the next step, with choices for furniture, odors fabrics <br /> r , etc. <br /> structural afra ing r e ecfrical mechanical,I 1 l mbing systems. 'Mr..Roberts went <br /> 'throughthe structural drawings with the committee. Access � ■H r <br /> orf maintenance,nance. sprinkler system #o the attic will b required for duct <br /> p m is included on both floors. The main bathroom- <br /> . <br /> to the meeting ,coir,. Ther i also staff toilet and chit are next <br /> second floor, but can be added. rens toilet. lone are planrr for the <br /> custodi J closet with a sink will need to be added <br /> -sink in the'staff room. The electrical plan 'includes tray l! a well as a <br /> #iuorcent lighting around the corn lighting for the display area recessed <br /> g computer area and over the stacks.s. A series ofpendant <br /> are planned for the ,Hain area on the first floor. lfght�ngs <br /> Preliminary Budget Estimate of Probable Projec <br /> Cost—Plans A and B(See Attachment A <br /> for full.details . Jack Foley o Construction Consulting� g. pared the attached estimated costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.