My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/27/2003 LIBRARY BUILDING COMMITTEE Minutes
>
5/27/2003 LIBRARY BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 5:10:24 PM
Creation date
4/9/2018 3:18:21 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
LIBRARY BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
05/27/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The estimates are conservative <br /> higher than hoped, but the architects prefer to err on the hi <br /> side. used on to a s cosh r incru 1 h <br /> i -built in � inflation cost, the total construction cost <br /> dor Plan i , with the tots project cost <br /> � J - $6J23,675. Pian construction cost estate <br /> with total project cost$6,434,050. Plan B substitute • <br /> ��rr� tr� for the exterior, and replaces thermal sl s a granite n��etrc <br /> - additional savings i � ate roof with asphalt: Thera� room for <br /> n mechanicals, as well. costs work out.to be roug <br /> My113 <br /> mechanicals; and 113 finishes. structure, 1/3 <br /> LL - .The Septic system for-the riga - _-.- .- <br /> r most'likely e y ori«tie into the a tepee Commons system. <br /> Sevin Connoily summed u e � � . <br /> and p ituator a folios: with estimated constr�uctio'r costs at 5.Ulna <br /> the town providing toward these costs the Lib .? <br />' t -Library or � itte w��l need to rare If . <br /> The committee needs to come up with a furndr isir� ian to <br /> present to the Town. It was <br /> - . suggested that w or up v�+ith a sopf�'rstrated,'siio presentation <br /> puce such a wiiiobr�d or P , have a general meeting at <br /> pponesset# and invite all interested parties, including-those who <br /> are potential big donors. Buff Chase offered to have Mashpee Com o asslQ}}' <br /> t in the 1 <br /> Presentation. <br /> Next Steps,. <br /> I. Architects were asked to attempt to ere do - <br /> p i wry the costs by 1 o%. Beyond that, the <br /> committee will need to scale back in.other areas of the current design. <br /> 2. The committee needs to determine what effect the library controtaon costs wue.ill have on <br /> . tee .-, Sevin and Buff: <br /> will meet with-Joyce Mason to et an ens <br /> Joyce.will be asked to-attend the co � war to this tst�pr�., - <br /> mmittee net meeting. <br /> The next meeting vf,the Library Building Com <br /> at :oo Pfd at the rr tte wras cheduled for Tuesday, June 10, 2003 <br /> llashpee Public Library. As there was no further business <br /> adjourned. the meeting was <br /> Respectfully submitted, <br /> ----- <br /> i ohmTRecording secretary <br /> 1 <br /> Attachments <br /> i <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.