Rough Outline of Proposed Schedule of Activities and Decisions <br /> I. Decision -What adjustments, if any, must he rade to maintain the existing <br /> Library while build g the new Library`s ti <br /> If siting ofth Library must be changed or the e fisting Library rust <br /> e demolished - construction., U 1 v to add 1 t <br /> the budget. <br /> 2. Decision - Finalizing the Sketch Plan for the Library and Preparation of a4-Model <br /> Schedule new'date for the L C's Presentation to the Seleetrh ri and make <br /> arrangements for a good turnout for the Presentation. <br /> .- -' Schedule preparation of the Warrant Article with the support of the Select en for <br /> the October Town Meeting, by July I - <br /> . A two thirds vote of the Town Meeting = <br /> b. A majority vote based on inclusion of the Town Meeting approved Article <br /> on ars election ballot. We v�l1 ha t get out the vote a those who might <br /> d .. <br /> oppose the Library will coxae out to vote against it. - <br /> Solicitation of bids for Architectural Services-(Schedule for these _ <br /> activities should be confirmed by the Architect and Joyce Mason and/or the Tow <br /> 4 <br /> Clerk/Attorney- Tentative Schedule: <br /> a. Solicit Bids for Architect in January, 2005. <br /> b. Review-and approve successful bidder by March, 2005. <br /> C. Complete Plans and Specifleatios And receive approval by Jane, <br /> 20051* ,_ ^ <br /> �{ � i <br /> : d. . . Solicit ]fids for Construction by July, 2005. <br /> - i <br /> I <br /> e. -Select successful hidderg by end of.Sep emb. r, 2 0.05. s = <br /> f! Start Construction by Noembereeernber, 2005.}. Y , <br /> g. Complete construction 'by,o tob er Nove b er. oo .- <br /> If we are to ensure that we have enough funds for construction, fund raising goals <br /> mu .t be net r exce ded. Ve will need $500,000 o more depending n the-the <br /> o the lowest laid. $500,000 if they bid is 9at or lower than the current a tji'm6ate t. <br /> 4 <br /> Up to S 7001000 if it exceeds the estimate by up I o9 - 00,000.- This amdunt will be-- <br /> needed <br /> -- <br /> n eded by June 2005. An additional $300,000 and/or equivalent in'donations'i I be <br /> need d by October Toe M9 ber 2006 for furnishing3� <br /> s. with a .5 Mam <br /> ll on-To <br /> supported bondin&for the Library, fund raising will have to likely achieve a total of <br /> $$800p000 to $1 minion to-realize the-Library. <br /> The foregoing is a first run-at the requirements of a schedule to reach Tower . y <br /> I e ing and to complete construction of the Library assuming that the decisions on <br /> construction costs and site planning will not increase the total budget a modified by <br /> the reduction of the Total Contingency from $311,99 . to $93,541 to bring the per <br /> quare foot cost t $185. <br />