My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/3/2004 LIBRARY BUILDING COMMITTEE Minutes
>
2/3/2004 LIBRARY BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 5:06:39 PM
Creation date
4/9/2018 3:22:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
LIBRARY BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/03/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee,Pubfie Libre = <br /> 0 budget includes a re of$3,4'1,900 for construction-,with o <br /> The �rrnt �1�1� . <br /> aiout for escalation of costs to the time biddiiag for constxuetion occurs. <br /> The figure is computed as follows: <br /> 1. . , f <br /> for oor stru ti r�M ug the GC's erhea&?rof�t and <br /> and Performance & Payment <br /> . 311199 1 for a 10% constniction contingency <br /> construction budget t a total of$-I, 900 or 1 per square footThis bus�� eo � <br /> C rrent constrlaetion costs are coining in at $185 per square foot. <br /> tut; Construction at $185 x 17,3 70= , 13,450. this basis the. <br /> Proposed Adjus <br /> contincrency is reduced t '$93,54 1 from $3 11, 1_ <br /> The item Furnishinu,..s in the amount of$274,000 11 be set apart from the construction <br /> budget. i <br /> Fees at$417,000 N 1 now be$390,000 for the Architect. � � "i-NT! This assumes <br /> , <br /> that This <br /> amount will be sufficient for the rchit'ect to re are the Platy & Specifications., <br /> _ id documents r is and submitted d bids o versee c�onstrac or The $27,000 <br /> review the <br /> f umishin s Fee -will be set aside from.the Construction Budget.. <br /> Project Expenses are $157,000 <br /> The 5% r t Contialleney is $213,995% <br /> The total costs attributable to nst tiOn is: $3,213,450-Construction <br /> 390,000 -Fees <br /> 157,000- Project Expenses <br /> 213,1995 - Project Contingency <br /> (based on $4,269,990) <br /> Total Construction $23,974,445 <br /> This amount <br /> excludes $274,000 in fir shin s, and $218,450 in continizency, a total of <br /> $4 92,74 5 0 of which 274 o00 would have to he financed nth fund raising. The total to e <br /> g for construction if the Town roves $3',500000 is $47=x,445, the <br /> rased fund raising <br /> difference between' $3,974,44 5 and million. This amount oud have be available <br /> construction could begin. The rei aini ,amount of$274,000 for fi fishings <br /> before ostru . <br /> odd have to be <br /> raised by fund raisin beeen the stmt of constructlon and completion <br /> of construction. <br /> This all assumes that the ' ids core in at or below the estimated cost <br /> for the project ($3,974,445). <br /> 'fie must review all of the figures and the assumptions in the <br /> mat rut be dome. � <br /> proposed budget for the Librarynow and before we resent aur r corm ndat�or to the <br /> Selectx en after the May Town Meeting <br /> - r . <br />
The URL can be used to link to this page
Your browser does not support the video tag.