Laserfiche WebLink
Toni O'Neill stated that he likes the idea of having the library close to Int. 151, which gives incoming traffic <br /> to Mash Pee a greater visibility of the new structure. Strategy## ,allows for ease of future additions to the <br /> site. Tam also suggested that under Strategy#2, the building facing Jobs Fishing could be elongated, <br /> thus eliminating the need for the other two buildings. Randall cautioned, however, that the control factor <br /> could be a problem with an elongated building. <br /> Tom also carne yap with the idea of doing an offset of three buildings, giving the library a New England <br /> appearance. This plan would also have the front of the building facing Job's Fishing Road. <br /> Randall Imai Mated that the fundamental question that needed to be answered was whether or not the <br /> existing library would be retained. if the concept of the proposed new library changes, then his design <br /> also would need to change. He suggested that the committee consider three possible plans: <br /> 1 combine Strategies##1 and,## , and keep the existing library <br /> 2 o with Strategy##3, eliminate the existing library and plan for future additional buildings <br /> 3 o with Torn O'Neill's plan for an offset of three buildings, with the front of the library facing Job's <br /> Fishing Road <br /> Sheldon stated that the committee would need a report for the next committee meeting as to what the use <br /> of the existing library would entail, i.e.: -- <br /> 1 renovation costs <br /> 2 determine whether it would be necessary to bring it up to code <br /> 3 what it would cost to bring it up to code <br /> The report also should.look at pieces of the current program that could be carried on in the existing <br /> building without too many changes. Stewart Roberts and Randall lrnai agreed to prepare such a report <br /> for the committee's next meeting. <br /> PROPOSED TIMELINE SCHEDULE FOR CONSTRUCTION of NEW LIBRARY(See Attachment D <br /> Sheldon stated that he had seat the attached proposed schedule to Joyce Mason for her review and <br /> comments to determine its feasibility. <br /> FUND RAISING <br /> Torn O'Neill announced that the fund to date has$110,000, with a goal of$250,000 at the time of the May <br /> Town Meeting. The workshop forum is scheduled to begin with a dinner on Friday evening,April-4469;� �.. �-- <br /> holding work sessions on Saturday,with departure on Sunday. He has 7 individuals lined up to <br /> participate in the sessions, including carol Gordon, the Chief Librarian at Boston University, and a <br /> representative from Bose Sound Systems, The goal is to generate enthusiasm for the new library project <br /> as'well as to glean valuable input from the invited forum participants. <br /> REVIEW OF ENERGY GIANT PAPER. <br /> Steve Cook stated that he Inas not yet had an opportunity to study the report from,bane Dolan. <br /> NEXT MEETING. <br /> The next meeting of the Library Building Committee is scheduled for Wednesday, March 3, X004# at the- <br /> I ashpee Library at 7:00 PM. As there was no further business, the meeting was adjourned at 8:45 PNi. <br /> Respectfully submitted, <br /> Ina G. S hlobohm <br /> Recording Secretary <br /> attachment <br /> 2 <br />