My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/30/2004 LIBRARY BUILDING COMMITTEE Minutes
>
11/30/2004 LIBRARY BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 5:04:35 PM
Creation date
4/9/2018 3:28:00 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
LIBRARY BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/30/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> GRANT APPLICATION WORK PROGRESS <br /> Sheldon reported that he and Helene DeFoe have been working on certain sections of the-application, and <br /> have-prepared an overall summary. Helene receiv d a request to contact Senator O'Leary re: the 1 <br /> Y bond issue-in'the legislative program for the Massachusefts.library building commissioners which she sent on <br /> to the senator sponsoring the bill. The State sent Helene a floppy dish for purposes of loading all the <br /> information for use by their reviewers. There are also Leven or- 'tght binders that will-need to be submitted to <br /> the State. Helene has began to fill out some of the forms. Some forms will need to be filled out by Stewart <br /> Roberts. The other'will be filled out as part of the great application. <br /> Target Dates: <br /> 12115/04—the State target date for completion of the Library Program Chart., The chart has been filled <br /> eut.'.wariting for Stewart Roberts to review and okay-before submitting to the State. <br /> - 1-2106/04—Board of Selectmen's Meeting for approval of Architect's contract <br /> 02109105—Grant Applic Mon submission deadline <br /> 06/3 0105-First fundraising tar'et date for half of the total-interim goal <br /> 07!07105--Announcement of results of the State Construction Grant Round <br /> Sheldon Gilbert reported that, based on the estimated.construction costs given by Stewart Roberts: the cost of <br /> the 17,000 sq.-ft. library hias slightly escalated, due to the addition of three.conU ng'e'ncy funds, which may <br /> amount to 15%. <br /> . <br /> Once-the architect's contract is.approved by the Selectmen, Stewart Roberts will creed to come up with thr e <br /> or four optional exterior design.sl etbhes, for reviewby fl a hp Commons and the LBS, Patience Jason <br /> will be invited to become involved in suggestions on ulterior design decisions. <br /> OLD BUSINESS <br /> 1 Bonnie Barrett asked about the shed for book storage. Dave Burton reported that a had a building <br /> permit.from the Town to erect the she scheduled to'be:installed next.week. Some trees will.need to <br /> be taken town the PW next Monday to make ro ar for the shed behih d t e,library. Jinn Walker, <br /> bopk sale chairman, will oversee the move of the cools from the library.to the shed. <br />,v $tewart Roberts has been asked to consider plans for a-cupola,-the staircase, the second floor} a <br /> basem6nt and areas for possible expansion In the future, since these arra al[included in-the'. 1,500 <br /> sq <br /> .ft library design a grant req' ' nt . Bonnie Barrett re'minded th c r rhifte#bat the that would <br /> agree on a.basement only for storage, or for meetings, but'not for staff use'.or for children's programs. <br /> 3) Dave L'rt n e col ih d that the schematic of the library that appears on the'pledge forret is merely a <br /> r primer ta�ti n of a municipal library b' ilding-and hot.the final s hematlb for the library. <br /> f <br /> NEW B S1Nt8s <br /> 1 Steve Cool distributed information h has gathered Leadership in Energy and <br /> d n LEE, ( <br /> Environmental Design)certification. Steve has identified' ito s-from project checklist that would <br /> be vAthihreason for the LBC to consider, in order to qualify then wr Ma hpee library for LEE! <br /> certification. The initial cost increase would probably- .,a unt to , but the savings.16.operating cosh <br /> Will be realized over tier_re. The Stewart Roberts' architectural'firm i LEED mated}•arid will be' asked to <br /> consider incorporating Borne of the item fro�rt the project chemist that Steve e.o k has i nti eo: <br /> 2) Dav e6 Baton received a call from the vlrnpeno Td1 fc 'rnquirirr _act the pptbility ofmoving <br /> the.old library budding t6their office_location on-G're' at` ecl 'Road South, or alt atively#-pr c rrng <br /> movable ble pmts of the b�illding, i.e., doors wlr�� w . �t bra F bests will ba asked to corrrr nt on the <br /> costs that wou ld b 'entailed in such a6 project. 'If this.is not feasible,Tbm O'Neill suggested the <br /> possibility of donating some furniture items to the True <br /> The nest meeting of the LBC was scheduled for Tuesday, Deoe ber 14, 2004, :oo PM at the Mashpee <br /> Library. As there was no further.business, the meeting was adjoulmed at 8;35 PM. <br /> Ina G. Schlob m <br /> Recording secretary <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.