My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/01/2005 LIBRARY BUILDING COMMITTEE Minutes
>
02/01/2005 LIBRARY BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 5:04:41 PM
Creation date
4/9/2018 3:30:29 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
LIBRARY BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/01/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TOWN OF M <br /> LIBRARY BUILDING COMMITTEE <br /> Minutes of the Meeting of Tuesday, February, 1. 2005 <br /> Committee Attendees: Also Attending: <br /> + Sheldon Gilbert Helene DFoe, Library Director <br /> Bonnie Barrett ,ferry Blurnengarten, Publicity Committee <br /> Maureen Rounds John Rent, Mashpee Commons <br /> Ed DeFoe Ann MacDonald Dailey, Liaison <br /> Tom 'Neill <br /> Steve Cool <br /> Jane Ddlan <br /> Diana Lannon <br /> Dave Burton <br /> Chairman Sheldon Gilbert called the meeting to order at 7:10 PM. <br /> REVIEW of MINUTES <br /> The minutes from the meeting of Thursday, January 27, 2005, were corrected as follows: on <br /> page 2, next to last paragraph, 11n 2, Change"one vote against the motion"to"two votes against <br /> the motion`. The committee unanimously approved the minutes as corrected_ <br /> FINAL BUDGET FOR GRANT APPLICATION <br /> The final budget figure is now$7,736,417. This includes$263,505 for geothermal equipment, o � <br /> which$25,000 is for architectural services. One advantage to including geothermal costs into the <br /> budget is that an additional 2004 of those costs are added to the grant funds. <br /> This brings the total eligible costs up to$7,058,873, which is the basis on which the grant amount <br /> is calculated. The grant money being applied for i $2,551,000. <br /> Steve Cook requested confirmation by the LBC that the geothermal casts would not be <br /> considered an alternate, but are, in fact, a line stern in the final budget for the grant application. <br /> After a brief discussion, the committee confirmed that the geothermal oasts would be a line item, <br /> not an alternate. <br /> Questions arose about the reason for the higher estimated costs_ Sheldon stated that the primary <br /> reason for the increase is due to increased costs in concrete, steely lumber and other <br /> commodities and the inclusion of$1,300,000 in contingencies, A much smaller amount for <br /> contingencies was included in the original es m ted budget figures. <br /> Stewart Roberts suggested that the professional roost estimator's estimate was conservative. <br /> Patience Jackson, IIBLC's Library Construction Consultant suggested that we not understate the <br /> contingencies to ensure that sufficient grant funds are requested to help cover the actual costs <br /> that will be incurred <br /> Implications of the now budget. As a result of the increased budget, $1,700,000 will now be <br /> required from fundraising efforts. $1,200,000 in cash will be required in hand when going out to <br /> bid on the building project. Fumiture costs are not included in this required amount and <br /> fundraising for such costs can be accomplished during the construction period. <br /> OVERVIEW of THE LIBRARY CONSTRUCTION PROGRAM <br /> Patience Jackson's comments regarding the Overview document prepared by Sheldon Gilbert for <br /> inclusion in the grant application were positive. Maureen Rounds did a very detailed review of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.