MASHPEE ZONING BOARD OF APPEALS
<br /> DECISION FOR A WRITTEN FINDING
<br /> Jason Stone
<br /> 156 Waterway(Map 105 Parcel 238)
<br /> Mashpee, MA 02649
<br /> FINDING-2016-40
<br /> 4. Construction of the dwelling is contingent upon Board of Health final approval.
<br /> 5. Construction of the dwelling will conform to current building code requirements.
<br /> 6. There is adequate land area to provide sufficient parking and setbacks as may be
<br /> required.
<br /> In view of the foregoing, the Board determined the Petitioner met all conditions of a
<br /> Written Finding under Mass General Law 40A Section 6. Upon motion duly made and
<br /> seconded at the Public Hearings on Wednesday, September 14, 2016,the Zoning Board of
<br /> Appeals voted unanimously to issue a Written Finding with the following conditions; all
<br /> comments read into the record submitted by the Board of Health, Conservation, and F
<br /> Inspection Departments.
<br /> A Plot Plan — Existing House Prepared for Jason Stone, 156 Waterway, Mashpee,
<br /> MA. BSS Design Engineering & Surveying, 164 Katharine Lee Bates Rd., Falmouth,
<br /> MA. Scale: 1 = 10', Date: July 8, 2016, (Received Sept. 8, 2016), Drawn: EJP, TJB,
<br /> Job Number: 15134, Revisions. Sheet 1 of 2, Title: Existing Conditions, Drawing
<br /> Number: B23-70.
<br /> A Plot Plan - Proposed House and Subsurface Sewage Disposal System: Prepared
<br /> for Jason Stone, 156 Waterway,Mashpee,MA. BSS Design Engineering& Surveying,
<br /> 164 Katharine Lee Bates Rd., Falmouth, MA, Scale: 1" = 10', Date: July 14, 2016,
<br /> Drawn EJP,MRT,Checked:JER,Job Number: 15134,Revisions: Extended Deck.July
<br /> 22, 2016 TJB. (Received: August 19, 2016), Sheet 2 of 2, Title: Site Plan and SSDS
<br /> Profile, Drawing Number: B23-70. Revisions: Extended Deck. July 22, 2016, TJB,
<br /> Corrected Upland Area, Changed Septic System Sept. 14, 2016, TJB.
<br /> 4
<br />
|