Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A WRITTEN FINDING <br /> Jason Stone <br /> 156 Waterway(Map 105 Parcel 238) <br /> Mashpee, MA 02649 <br /> FINDING-2016-40 <br /> 4. Construction of the dwelling is contingent upon Board of Health final approval. <br /> 5. Construction of the dwelling will conform to current building code requirements. <br /> 6. There is adequate land area to provide sufficient parking and setbacks as may be <br /> required. <br /> In view of the foregoing, the Board determined the Petitioner met all conditions of a <br /> Written Finding under Mass General Law 40A Section 6. Upon motion duly made and <br /> seconded at the Public Hearings on Wednesday, September 14, 2016,the Zoning Board of <br /> Appeals voted unanimously to issue a Written Finding with the following conditions; all <br /> comments read into the record submitted by the Board of Health, Conservation, and F <br /> Inspection Departments. <br /> A Plot Plan — Existing House Prepared for Jason Stone, 156 Waterway, Mashpee, <br /> MA. BSS Design Engineering & Surveying, 164 Katharine Lee Bates Rd., Falmouth, <br /> MA. Scale: 1 = 10', Date: July 8, 2016, (Received Sept. 8, 2016), Drawn: EJP, TJB, <br /> Job Number: 15134, Revisions. Sheet 1 of 2, Title: Existing Conditions, Drawing <br /> Number: B23-70. <br /> A Plot Plan - Proposed House and Subsurface Sewage Disposal System: Prepared <br /> for Jason Stone, 156 Waterway,Mashpee,MA. BSS Design Engineering& Surveying, <br /> 164 Katharine Lee Bates Rd., Falmouth, MA, Scale: 1" = 10', Date: July 14, 2016, <br /> Drawn EJP,MRT,Checked:JER,Job Number: 15134,Revisions: Extended Deck.July <br /> 22, 2016 TJB. (Received: August 19, 2016), Sheet 2 of 2, Title: Site Plan and SSDS <br /> Profile, Drawing Number: B23-70. Revisions: Extended Deck. July 22, 2016, TJB, <br /> Corrected Upland Area, Changed Septic System Sept. 14, 2016, TJB. <br /> 4 <br />