My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/20/1999 SCHOOL COMMITTEE Minutes
>
01/20/1999 SCHOOL COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2018 5:01:54 PM
Creation date
4/13/2018 1:21:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/20/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE SCHOOL COMM'" - REGULAR MEETING ` FEBRUARY 3, 1999 <br /> PAGE 5 <br /> Coaching Appointments (conftnued).- <br /> Scot Wenzel - Baseball <br /> Michael Home - Varsity Softball <br /> Vincent McGuinness - JV softball <br /> Daviel Velesig- softball <br /> 'reel O'Rourke - Varsity Golf <br /> Hamm Jones - Varsity Wrack <br /> Paul Phinney - Assistant `rack <br /> Rob Miceli - Varsity Boys'T nnis <br /> Susan Lochiatto - Varsity Girls'Tennis <br /> Dave Fitzgerald - Weight born spring <br /> .2 Food Service Update - Mr. MacDonald reported that the <br /> food service program had a profit of $1,069-56 for the month <br /> of December, 1998. Also, an initial audit of the food service <br /> program was excellent. <br /> .3 Enrollments - Mr. MacDonald reported there was a <br /> district total of 2,128 students with 53 Mashpee students <br /> attending Cape Cod Tech. <br /> 7.4 , Facilities Report - School Facilities Supervisor Borg <br /> Cook updated the Committee as follows: <br /> Coombs school: <br /> • Annual inspection for kitchen hood fire suppression <br /> system.. <br /> • As requested by the school Committee to check excess <br /> natural gas consumption as compared to the Quashnet <br /> Schools and High School. The ureter was tested by the Gas <br /> Company and is working properly. Mr. Cook discovered <br /> that the four new rooftop heating units installed this past <br /> ,August are not connected to the time clock system and run <br /> continuously. The units will be connected to the clock <br /> system this geek. A comparison can be made following the <br /> February meter reading. <br /> On January 22, 1999, Mr. Cook contacted the design engineer <br /> for the HVAC project asking why the neer units were not <br /> specified connected to the clock system. The engineer agreed <br /> he should have specified this connection and would have an <br /> answer by January 25th. As of this <br />
The URL can be used to link to this page
Your browser does not support the video tag.