Laserfiche WebLink
i <br /> MAS 'EE SCHOOL COMMITTEE REGULAR MEETING -AUGUST 10, 1999 PAGE <br /> summer. A plan to implement new cleaning practices and a <br /> burnishing program is in place for the upcoming school year. <br /> meeting has been scheduled to discuss the rooftop units at <br /> the Coombs School that were installed last fail. A plan for <br /> corrective action between the engineer and the installer will <br /> be decided. <br /> Mr. Cook reported the following flooring problems at the high <br /> school: <br /> Caret Seams: <br /> A carpeting installer was called in to inspect the fai.lg <br /> seams. He found that seam sealer was not used. The <br /> architect's specification calls for installation to be according <br /> i <br /> to the manufacturer's reconuendations. <br /> Staining on Vinyl-Tiles: <br /> The brown staining on the tiles is increasing. It appears the <br /> adhesive is coning through the tiles from moisture in the <br /> concrete. The architect's specification call for bond and <br /> moisture tests to be performed on- the concrete before <br /> flooring is installed. The construction records should <br /> indicate it hese tests were done and what the results were. <br /> HVAC filters and lubrication by maintenance staff' will be <br /> clone at the end of August. <br /> Fields to be lined and equipment taut in place for fall sports <br /> by maintenance staff. <br /> 7.5 FY2000 Budget Review - Business Manager Russ <br /> McGown said transfers (Exhibit ) Frere required in circler- to <br /> accommodate negotiations funding. <br /> .Motion made by Mrs. Cook, seconded by Mrs. Mills, t <br /> approve the transfers as proposed. <br /> NOTE: Unanimous <br /> Mr. F'luery reiterated the following' upcog dates: <br /> School Committee Retreat- August 16, 1999 <br /> August <br /> Adm nistrative Retreat- and 26, 1999 <br /> New Staff Reception- September 1, 1999 <br /> Teachers' Opening Date - September 7, 1999 <br />